<?xml version="1.0" encoding="UTF-8"?><rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:content="http://purl.org/rss/1.0/modules/content/" xmlns:atom="http://www.w3.org/2005/Atom" version="2.0" xmlns:itunes="http://www.itunes.com/dtds/podcast-1.0.dtd" xmlns:googleplay="http://www.google.com/schemas/play-podcasts/1.0"><channel><title><![CDATA[PHUONGLIB: Engineering Economics]]></title><description><![CDATA[Financial thinking for project decisions: the time value of money, interest traps, IRR, risk, sensitivity and the value of information.]]></description><link>https://www.phuonglib.com/s/engineering-economics</link><image><url>https://substackcdn.com/image/fetch/$s_!tUFo!,w_256,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F68ab7f3d-2ea9-431f-a018-11cffe5264ac_1000x1000.png</url><title>PHUONGLIB: Engineering Economics</title><link>https://www.phuonglib.com/s/engineering-economics</link></image><generator>Substack</generator><lastBuildDate>Fri, 27 Nov 2026 18:40:33 GMT</lastBuildDate><atom:link href="https://www.phuonglib.com/feed" rel="self" type="application/rss+xml"/><copyright><![CDATA[Phuong Nguyen]]></copyright><language><![CDATA[en]]></language><webMaster><![CDATA[phuonglib@substack.com]]></webMaster><itunes:owner><itunes:email><![CDATA[phuonglib@substack.com]]></itunes:email><itunes:name><![CDATA[PHUONGLIB]]></itunes:name></itunes:owner><itunes:author><![CDATA[PHUONGLIB]]></itunes:author><googleplay:owner><![CDATA[phuonglib@substack.com]]></googleplay:owner><googleplay:email><![CDATA[phuonglib@substack.com]]></googleplay:email><googleplay:author><![CDATA[PHUONGLIB]]></googleplay:author><itunes:block><![CDATA[Yes]]></itunes:block><item><title><![CDATA[Project Risk Analysis with Tornado Diagrams, Monte Carlo Simulation and the Value of Information]]></title><description><![CDATA[How spider plots, switching values, scenarios, decision trees, Monte Carlo and risk premiums show how far to trust a project's NPV]]></description><link>https://www.phuonglib.com/p/project-risk-sensitivity-and-value-of-information</link><guid isPermaLink="false">https://www.phuonglib.com/p/project-risk-sensitivity-and-value-of-information</guid><dc:creator><![CDATA[PHUONGLIB]]></dc:creator><pubDate>Fri, 27 Nov 2026 18:29:22 GMT</pubDate><enclosure url="https://substack-post-media.s3.amazonaws.com/public/images/43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp" length="0" type="image/jpeg"/><content:encoded><![CDATA[<div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!P2Mm!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!P2Mm!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp 424w, https://substackcdn.com/image/fetch/$s_!P2Mm!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp 848w, https://substackcdn.com/image/fetch/$s_!P2Mm!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp 1272w, https://substackcdn.com/image/fetch/$s_!P2Mm!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp 1456w" sizes="100vw"><img src="https://substackcdn.com/image/fetch/$s_!P2Mm!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp" width="2560" height="1440" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1440,&quot;width&quot;:2560,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:713866,&quot;alt&quot;:&quot;A small engineer stands on a narrow plank bridge over a misty gorge, tapping the planks ahead with a glowing orange probe while a balance scale on the far bank weighs a crate against a cloud.&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/webp&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:false,&quot;topImage&quot;:true,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="A small engineer stands on a narrow plank bridge over a misty gorge, tapping the planks ahead with a glowing orange probe while a balance scale on the far bank weighs a crate against a cloud." title="A small engineer stands on a narrow plank bridge over a misty gorge, tapping the planks ahead with a glowing orange probe while a balance scale on the far bank weighs a crate against a cloud." srcset="https://substackcdn.com/image/fetch/$s_!P2Mm!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp 424w, https://substackcdn.com/image/fetch/$s_!P2Mm!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp 848w, https://substackcdn.com/image/fetch/$s_!P2Mm!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp 1272w, https://substackcdn.com/image/fetch/$s_!P2Mm!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43a198fa-8859-421c-a675-e1589ebbdcd4_2560x1440.webp 1456w" sizes="100vw" fetchpriority="high"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><blockquote><p><strong>Key takeaways</strong></p><ul><li><p>A positive NPV is a single point built on forecasts. Spider plots and tornado diagrams show which inputs move it most; switching values tell managers how wrong a forecast can be before the decision flips.</p></li><li><p>Safety margins computed one variable at a time do not add up: in the worked case, a 15% cash-flow shortfall and a 20% cost overrun are each "safe" alone but together turn the NPV negative.</p></li><li><p>The expected value of perfect information (EVPI) is only a ceiling. A real test market that can mislead must be valued with Bayes' theorem, and a study priced below EVPI can still be a bad buy.</p></li><li><p>Monte Carlo simulation handles many inputs at once, but ignoring the correlation between cost overruns and weak sales made the probability of loss look about a quarter smaller than it was.</p></li><li><p>Adding a risk premium to the MARR suits steady, economy-wide risk. It double-counts risk when cash flows are already pessimistic and penalizes long-lived projects far more than their real risk warrants.</p></li></ul></blockquote><div><hr></div><p>Large projects around the world miss their numbers in a remarkably consistent direction. Studying hundreds of infrastructure and corporate projects, Flyvbjerg (2006) found that cost overruns and benefit shortfalls are the rule rather than the exception, and that the errors lean toward optimism far more often than chance would allow. Yet the investment proposals that start these projects usually present a single net present value (NPV), computed from a single forecast of each input, as if the future were already known.</p><p>Consider a small illustrative case. A fruit processor is weighing a compact freeze-drying line for mango and jackfruit snacks, to be sold to supermarket chains and export buyers. The estimated investment is $80,000, the expected net cash flow is $20,800 a year for 8 years, the line should fetch about $8,000 at the end of its life and the company's minimum attractive rate of return (MARR) is 12% a year. With (P/A, 12%, 8) = 4.9676 and (P/F, 12%, 8) = 0.4039, the net present value is NPV = &#8722;80,000 + 20,800 &#215; 4.9676 + 8,000 &#215; 0.4039 = $26,558. The figure is positive and comfortably large, so that is what the proposal to the board reports.</p><p>None of these inputs is a known fact. Is $80,000 a supplier's binding quote or a rough estimate? What volume, raw fruit price and exchange rate lie behind the $20,800 cash flow? Is eight years the technical life of the equipment or its economic life before a better technology arrives? Each question opens a range. Risk analysis does not change the $26,558; it tells the decision maker how much to trust it, which inputs must be pinned down before money is committed and whether it is worth paying to learn more first.</p><p>This article works through that question in ten sections. Section 1 separates uncertainty from risk. Section 2 presents one-variable sensitivity analysis through spider plots and tornado diagrams. Section 3 computes switching values and safety margins. Section 4 builds three consistent scenarios and computes the expected value and standard deviation. Section 5 estimates the probability of a loss. Section 6 uses a decision tree to price information, separating the value of perfect information from the value of a test that can be wrong. Section 7 runs a Monte Carlo simulation. Section 8 discusses when a risk premium in the MARR helps and when it misleads. Section 9 shows how to build the whole analysis in a spreadsheet and Section 10 collects the common mistakes.</p><h2>1. Uncertainty and risk</h2><p>This section separates two words that are often used interchangeably, because in project analysis they describe different levels of knowledge and call for different tools.</p><p>Uncertainty describes a variable that can take several values when we cannot assign a probability to each. Risk describes a variable whose probability distribution is known, or can be estimated on a sound basis. The distinction is usually traced to Knight (1921), who separated risk that can be measured by probabilities from uncertainty that cannot. Under uncertainty, the analyst relies on tools that need no probabilities, such as sensitivity analysis and switching values; once probabilities can be assigned, expected values, standard deviations, decision trees and simulation become available (Park, 2019).</p><p>Most business projects sit in the gray zone between the two, so both families of tools are usually needed. A common trap is to treat a probability guessed by an expert as if it had been measured from data: a figure of 0.25 looks as precise as any other number, so readers of the report cannot tell that the analysis is still in the territory of uncertainty. It also helps to separate parameter uncertainty, where the structure of the problem is known but the values of inputs such as next year's fruit price are not, from structural uncertainty, where the model itself may be wrong because an importing country changes its food safety rules or a much cheaper drying technology appears. The tools in this article handle the first kind well. The second kind can only be managed through flexible design, such as choosing a dryer that can process several fruits, combined with periodic reviews of the decision.</p><h2>2. One-variable sensitivity analysis</h2><p>Sensitivity analysis is the first tool analysts reach for and the most widely used. This section presents two ways to draw its results and the most important limit on what it can say.</p><p>The procedure is simple: vary one input at a time over a range, for example plus or minus 30%, hold every other input at its base value and record the NPV. The interesting part is not the arithmetic but how the results are read and presented so that the importance of several inputs can be compared at a glance.</p><h3>2.1. Spider plots</h3><p>A spider plot draws NPV as a function of the percentage change in each input, so every line passes through the base case. Figure 1 shows the plot for the freeze-drying line with five inputs: net annual cash flow A, investment P, MARR i, salvage value S and life n.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!4YDj!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!4YDj!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png 424w, https://substackcdn.com/image/fetch/$s_!4YDj!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png 848w, https://substackcdn.com/image/fetch/$s_!4YDj!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png 1272w, https://substackcdn.com/image/fetch/$s_!4YDj!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!4YDj!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png" width="2247" height="1055" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1055,&quot;width&quot;:2247,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:168705,&quot;alt&quot;:&quot;Spider plot with the change from base value from minus 30 to plus 30 percent on the horizontal axis and NPV in US dollars on the vertical axis; five lines cross at the base case of 26,558 dollars; the net cash flow line rises most steeply and crosses zero NPV at a 25.7 percent fall; the investment line slopes down; the MARR line slopes down with slight curvature; the salvage value line is almost flat; life is shown as separate dashed points from 6 to 10 years&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Spider plot with the change from base value from minus 30 to plus 30 percent on the horizontal axis and NPV in US dollars on the vertical axis; five lines cross at the base case of 26,558 dollars; the net cash flow line rises most steeply and crosses zero NPV at a 25.7 percent fall; the investment line slopes down; the MARR line slopes down with slight curvature; the salvage value line is almost flat; life is shown as separate dashed points from 6 to 10 years" title="Spider plot with the change from base value from minus 30 to plus 30 percent on the horizontal axis and NPV in US dollars on the vertical axis; five lines cross at the base case of 26,558 dollars; the net cash flow line rises most steeply and crosses zero NPV at a 25.7 percent fall; the investment line slopes down; the MARR line slopes down with slight curvature; the salvage value line is almost flat; life is shown as separate dashed points from 6 to 10 years" srcset="https://substackcdn.com/image/fetch/$s_!4YDj!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png 424w, https://substackcdn.com/image/fetch/$s_!4YDj!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png 848w, https://substackcdn.com/image/fetch/$s_!4YDj!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png 1272w, https://substackcdn.com/image/fetch/$s_!4YDj!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F69643528-5b90-4a76-b8b7-90e3d1eaf46f_2247x1055.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 1. Spider plot for the freeze-drying line: the slope of each line shows how sensitive NPV is to that input (illustrative figures).</figcaption></figure></div><p>In Figure 1 the slope carries the message. The steeper a line, the more sensitive the NPV is to that input. The net cash flow line is the steepest and crosses zero when cash flow falls by about 25.7%; the salvage value line is nearly flat, so there is no point arguing about what the equipment will fetch in eight years. The MARR line curves slightly because i enters the denominator through a power, while the lines for A, P and S are perfectly straight because NPV is a linear function of each. Life must be a whole number of years, so it appears as separate points.</p><h3>2.2. Tornado diagrams and labeling both ends of each bar</h3><p>A tornado diagram presents the same information as horizontal bars. Each bar spans the NPV obtained as one input moves from its low level to its high level, and the bars are sorted from widest to narrowest, which gives the chart its funnel shape. Table 1 holds the data behind the diagram, with ranges of plus or minus 30% for A, P, S and i, and life rounded to 6 and 10 years.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/tRndu/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/4c961b6c-7c8f-4865-a3ca-bb06e93b4e3d_1220x682.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/ceb840cb-83b5-4cc5-8af0-b2b4899e52b6_1220x852.png&quot;,&quot;height&quot;:343,&quot;title&quot;:&quot;Table 1. Sensitivity of the freeze-drying line's NPV when each input changes and the others stay at base values (US$, illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/tRndu/1/" width="730" height="343" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>The detail that needs care when Table 1 becomes a chart is the labeling of each bar's ends. For A, n and S, the low level of the input gives the low NPV; for P and i it is the other way round: the highest investment, $104,000, is the end that gives the lowest NPV, and the 8.4% MARR is the end that gives the highest. A chart that labels the left end "low" and the right end "high" for every bar will mislabel the bars for P and i, a mistake that automated charting tools make often. The safe practice is to write, at each end of each bar, the specific value of the input and the resulting NPV, as in Figure 2.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!CiMr!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!CiMr!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png 424w, https://substackcdn.com/image/fetch/$s_!CiMr!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png 848w, https://substackcdn.com/image/fetch/$s_!CiMr!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png 1272w, https://substackcdn.com/image/fetch/$s_!CiMr!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!CiMr!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png" width="2106" height="1162" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/a0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1162,&quot;width&quot;:2106,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:133276,&quot;alt&quot;:&quot;Tornado diagram with five horizontal bars sorted by width around a vertical line at the base NPV of 26,558 dollars; each end is labeled with the input value and NPV: net cash flow 14,560 dollars gives minus 4,440 and 27,040 dollars gives 57,556; investment 104,000 dollars gives 2,558 and 56,000 dollars gives 50,558; life 6 years gives 9,570 and 10 years gives 40,100; MARR 15.6 percent gives 14,032 and 8.4 percent gives 41,933; salvage value 5,600 dollars gives 25,589 and 10,400 dollars gives 27,527; a dashed line marks NPV equal to zero&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Tornado diagram with five horizontal bars sorted by width around a vertical line at the base NPV of 26,558 dollars; each end is labeled with the input value and NPV: net cash flow 14,560 dollars gives minus 4,440 and 27,040 dollars gives 57,556; investment 104,000 dollars gives 2,558 and 56,000 dollars gives 50,558; life 6 years gives 9,570 and 10 years gives 40,100; MARR 15.6 percent gives 14,032 and 8.4 percent gives 41,933; salvage value 5,600 dollars gives 25,589 and 10,400 dollars gives 27,527; a dashed line marks NPV equal to zero" title="Tornado diagram with five horizontal bars sorted by width around a vertical line at the base NPV of 26,558 dollars; each end is labeled with the input value and NPV: net cash flow 14,560 dollars gives minus 4,440 and 27,040 dollars gives 57,556; investment 104,000 dollars gives 2,558 and 56,000 dollars gives 50,558; life 6 years gives 9,570 and 10 years gives 40,100; MARR 15.6 percent gives 14,032 and 8.4 percent gives 41,933; salvage value 5,600 dollars gives 25,589 and 10,400 dollars gives 27,527; a dashed line marks NPV equal to zero" srcset="https://substackcdn.com/image/fetch/$s_!CiMr!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png 424w, https://substackcdn.com/image/fetch/$s_!CiMr!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png 848w, https://substackcdn.com/image/fetch/$s_!CiMr!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png 1272w, https://substackcdn.com/image/fetch/$s_!CiMr!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fa0b05ced-3df7-4d51-8795-f88f9a36087a_2106x1162.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 2. Tornado diagram for the freeze-drying line; each end of a bar shows the input level and the resulting NPV, red where NPV falls below the base case and teal where it rises above (illustrative figures).</figcaption></figure></div><p>Figure 2 leads to a clear course of action. Net cash flow is the most critical input, with an NPV range of $61,996, and it is the only input that can push NPV below zero on its own within the plus or minus 30% band. Investment comes second: at $104,000 the project still earns only $2,558. Salvage value hardly matters. The project team should spend its effort firming up the revenue forecast (supermarket orders, export prices) and the investment estimate (a binding quote from the equipment supplier) rather than refining the resale price.</p><h3>2.3. The limit of changing one input at a time</h3><p>One-variable analysis holds every other input fixed, so it ignores the correlation between them. This subsection explains why that limit usually makes the picture look better than it is.</p><p>In practice, inputs rarely move independently. When the local currency weakens sharply, imported equipment costs more, so the investment exceeds its estimate; at the same time imported packaging costs more, so net cash flow falls. When consumer demand weakens, volume and price fall together. Inputs deteriorate together because they share a root cause, so the real risk is larger than the individual tornado bars suggest. Sensitivity analysis is therefore a screening step that identifies the inputs that matter, not the final word.</p><h2>3. Switching values and safety margins</h2><p>Sensitivity analysis asks how much NPV changes when an input changes. A switching value asks the reverse question: how bad must this input become before the decision flips? This section computes the switching value for each input and explains why the resulting safety margins cannot be added together.</p><p>The switching value of an input is the value that makes NPV equal to zero while the other inputs stay at their base values. For a uniform cash flow it can be solved directly: A* = [P &#8722; S &#215; (P/F, i, n)] / (P/A, i, n) = (80,000 &#8722; 8,000 &#215; 0.4039) / 4.9676 = $15,454 a year. Against the forecast of $20,800, net cash flow can fall by 25.7% before the project stops paying its way; that gap is the input's safety margin. Table 2 repeats the exercise for the other inputs.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/OzDKc/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/7c0e74e3-939b-4d6d-8245-ed32834f83fe_1220x1166.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/aa10fd26-5e50-49ba-aca7-d268d75179ce_1220x1286.png&quot;,&quot;height&quot;:589,&quot;title&quot;:&quot;Table 2. Switching values and safety margins for the freeze-drying line (illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/OzDKc/1/" width="730" height="589" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>The MARR row in Table 2 deserves attention: the discount rate that makes NPV equal to zero is the definition of the internal rate of return. In other words, the IRR is simply the switching value of the MARR. The same idea is used in public cost-benefit analysis to find the level of benefits or capital cost that brings a benefit-cost ratio down to 1.</p><p>The strength of switching values is that they express uncertainty in terms managers can judge. "NPV is sensitive to cash flow" is abstract; "net cash flow must fall short by more than a quarter before the project stops paying" is a statement a sales director can test against experience. Translating it into revenue takes one more step: if operating costs stay fixed, every dollar of lost revenue comes straight out of net cash flow. With revenue of $52,000 a year, the $5,346 cash-flow shortfall corresponds to a revenue drop of only about 10.3%.</p><p>The limit of this tool is that each switching value assumes every other input stays put, so the safety margins do not add up. If cash flow falls 15% and the investment overruns by 20% at the same time, each input stays well within its own margin, yet the NPV becomes &#8722;96,000 + 17,680 &#215; 4.9676 + 8,000 &#215; 0.4039 = &#8722;$4,941, and the project loses money.</p><h2>4. Scenario analysis</h2><p>To overcome the main weakness of one-variable analysis, scenario analysis changes several inputs at once in combinations that make sense together. This section builds three scenarios and then computes the expected value, standard deviation and coefficient of variation.</p><h3>4.1. Scenarios must be internally consistent</h3><p>A pessimistic scenario is not built by mechanically taking the worst value of every input; doing so with A = $14,560, P = $104,000, n = 6 and S = $5,600 gives an NPV of &#8722;$41,301, a future that is almost impossible. A credible scenario tells a story: the currency weakens sharply, so the investment rises to $96,000; at the same time demand softens and export orders stall, so net cash flow is only $15,200; and a new generation of drying technology means the line stays competitive for only 6 years. The optimistic scenario is built the same way: a long-term contract with a large supermarket chain, a discount from the equipment supplier and a line that runs for 9 years. Table 3 sets out the three scenarios, with the MARR held at 12% and salvage value at $8,000.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/ya7RN/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/096b9669-7ee6-479a-a8ff-e8f46b7ec12d_1220x852.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/e6ce0c66-a609-488e-b7ce-f43d53c61a36_1220x972.png&quot;,&quot;height&quot;:445,&quot;title&quot;:&quot;Table 3. Three scenarios for the freeze-drying line and their risk measures (US$, illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/ya7RN/1/" width="730" height="445" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><h3>4.2. Expected value, standard deviation and coefficient of variation</h3><p>The expected value is the probability-weighted average of the outcomes: E(NPV) is the sum of p_k &#215; NPV_k. For Table 3, E(NPV) = 0.25 &#215; (&#8722;29,454) + 0.50 &#215; 26,558 + 0.25 &#215; 65,288 = $22,238, about $4,320 below the base case, because the pessimistic scenario loses more than the optimistic scenario gains.</p><p>The expected value on its own says nothing about dispersion. The standard measure of dispersion is the standard deviation: &#963;&#178; = 0.25 &#215; (&#8722;29,454 &#8722; 22,238)&#178; + 0.50 &#215; (26,558 &#8722; 22,238)&#178; + 0.25 &#215; (65,288 &#8722; 22,238)&#178; &#8776; 1.141 billion, so &#963; &#8776; $33,774. To compare projects of different sizes, the coefficient of variation is used: CV = &#963; / E(NPV) = 33,774 / 22,238 = 1.52. A dispersion larger than the expected value itself signals high risk: the project is worth doing on expectation, but the company has to ask whether it can absorb a loss of nearly $30,000 if the pessimistic scenario occurs (Newnan et al., 2020). The coefficient of variation loses its meaning when the expected value is close to zero or negative; in that case, report &#963; directly together with the probability of a loss.</p><h2>5. Estimating the probability of a loss</h2><p>Decision makers often want a simpler number: what is the chance that the project loses money? This section presents an estimate based on the normal distribution and three limits that must be stated whenever it is used.</p><p>If NPV is assumed to be roughly normally distributed, the zero point can be standardized: z = (0 &#8722; E) / &#963; = (0 &#8722; 22,238) / 33,774 = &#8722;0.66. The probability that NPV is below zero is the area of the standard normal distribution to the left of z, about 25.5%; the spreadsheet function NORM.DIST(0, 22238, 33774, TRUE) gives the same result. Put simply, the project has about a one-in-four chance of losing money.</p><p>The number has three limits. First, the normal distribution is only an approximation, and a rough one here because there are only three discrete scenarios: if the three-scenario model is taken literally, the probability of a loss is exactly the probability of the pessimistic scenario, 25%, and the closeness of the two numbers is a coincidence. Second, the probabilities of 0.25 and 0.50 are subjective judgments: if the pessimistic scenario had a probability of 0.35 and the optimistic one 0.15, the expected value would drop to $12,763. Third, "a 25.5% probability of loss" sounds far more scientific than it is. The honest presentation states the number together with its assumptions and shows what happens when those subjective probabilities are changed.</p><h2>6. Decision trees and the value of information</h2><p>A decision tree compares multi-step strategies in which later choices depend on information gathered earlier. This section uses a tree to answer a very practical question for a capital project: is it worth paying to learn more before investing, and if so, how much?</p><h3>6.1. Perfect information and EVPI</h3><p>A tree has two kinds of nodes. At a decision node, drawn as a square, the company picks the branch with the best expected value. At a chance node, drawn as a circle, the market decides, so the analyst takes a probability-weighted average. The tree is solved backward from the tips to the root. The fruit processor has three options: invest now, with an expected value of $22,238; do not invest; or spend $2,400 on a market study first and decide afterward. Figure 3 draws the tree under the temporary assumption that the study reveals with certainty which state the market will be in.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!ppMN!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!ppMN!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png 424w, https://substackcdn.com/image/fetch/$s_!ppMN!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png 848w, https://substackcdn.com/image/fetch/$s_!ppMN!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png 1272w, https://substackcdn.com/image/fetch/$s_!ppMN!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!ppMN!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png" width="2137" height="1322" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/c3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1322,&quot;width&quot;:2137,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:225608,&quot;alt&quot;:&quot;Decision tree with three branches from a square decision node: invest now leads to a chance node with expected value 22,238 dollars and outcomes of minus 29,454, 26,558 and 65,288 dollars; do not invest gives 0; a perfect study costing 2,400 dollars leads to a chance node with expected value 29,601 dollars, or 27,201 after the fee, where a weak market report leads to staying out and base or strong reports lead to investing; a line at the bottom reads EVPI equals 7,363 dollars and the net gain after the study fee is 4,963 dollars&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Decision tree with three branches from a square decision node: invest now leads to a chance node with expected value 22,238 dollars and outcomes of minus 29,454, 26,558 and 65,288 dollars; do not invest gives 0; a perfect study costing 2,400 dollars leads to a chance node with expected value 29,601 dollars, or 27,201 after the fee, where a weak market report leads to staying out and base or strong reports lead to investing; a line at the bottom reads EVPI equals 7,363 dollars and the net gain after the study fee is 4,963 dollars" title="Decision tree with three branches from a square decision node: invest now leads to a chance node with expected value 22,238 dollars and outcomes of minus 29,454, 26,558 and 65,288 dollars; do not invest gives 0; a perfect study costing 2,400 dollars leads to a chance node with expected value 29,601 dollars, or 27,201 after the fee, where a weak market report leads to staying out and base or strong reports lead to investing; a line at the bottom reads EVPI equals 7,363 dollars and the net gain after the study fee is 4,963 dollars" srcset="https://substackcdn.com/image/fetch/$s_!ppMN!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png 424w, https://substackcdn.com/image/fetch/$s_!ppMN!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png 848w, https://substackcdn.com/image/fetch/$s_!ppMN!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png 1272w, https://substackcdn.com/image/fetch/$s_!ppMN!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fc3f89cd3-95ff-46e8-9fbc-2eae98be2020_2137x1322.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 3. Decision tree comparing investing now with studying the market first, assuming the study gives perfect information (US$, illustrative figures).</figcaption></figure></div><p>Following Figure 3, if the study reports a strong market, the company invests and earns $65,288; if it reports the base market, the company invests and earns $26,558; if it reports a weak market, the company stays out and receives $0 instead of losing $29,454. The expected value with advance knowledge is 0.25 &#215; 65,288 + 0.50 &#215; 26,558 + 0.25 &#215; 0 = $29,601.</p><p>Two numbers need to be kept apart. The difference 29,601 &#8722; 22,238 = $7,363 is the <strong>expected value of perfect information</strong> (EVPI): the most the company should pay for any source of information about the state of the market, because no source can beat knowing for certain. The figure of $4,963 is something else: the net gain of the study strategy over investing now, equal to EVPI minus the $2,400 fee, and valid only if the study is truly perfect. Confusing $4,963 with EVPI confuses "the price ceiling for information" with "the profit left after paying for it". Notice also that information does not make the project better; it only helps avoid the bad branch. Here EVPI is exactly 0.25 &#215; 29,454, the loss in the pessimistic scenario times its probability. For a capital project this is the typical shape of the value of information: it is the expected loss that a timely "no" would have prevented.</p><h3>6.2. Imperfect information: small and large test markets</h3><p>No study reveals the future with certainty. This subsection prices a test that can be wrong, using the expected value of sample information (EVSI) obtained through Bayes' theorem, and focuses on what the result means for the investment decision.</p><p>Suppose that for $2,400 the company can sell the product through two supermarket chains for three months. The result is reported only as "favorable" or "poor" and can be wrong. A small test reports "poor" with probability 0.8 when the market is really weak, 0.2 when it is at the base level and 0.1 when it is strong. The probability of a "poor" report is 0.25 &#215; 0.8 + 0.50 &#215; 0.2 + 0.25 &#215; 0.1 = 0.325. By Bayes' theorem, after a "poor" report the probability of a weak market rises from 0.25 to 0.2 / 0.325 = 0.615, the base market falls to 0.308 and the strong market to 0.077; the expected NPV under these revised probabilities is &#8722;$4,931, so the company does not invest. After a "favorable" report (probability 0.675), the expected NPV is $35,319, so it invests. The expected value of the test strategy before the fee is 0.675 &#215; 35,319 = $23,840, so EVSI = 23,840 &#8722; 22,238 = $1,603. Table 4 places this option beside a larger, more accurate test and beside perfect information.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/Bm0hw/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/9d3ae18b-1a41-4ee7-a47f-e201765bb3d2_1220x842.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/5339fe90-0b5d-4b37-8b51-fb351c349d43_1220x1012.png&quot;,&quot;height&quot;:476,&quot;title&quot;:&quot;Table 4. Value of perfect and imperfect information for the freeze-drying line, with a study fee of $2,400 (US$, illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/Bm0hw/1/" width="730" height="476" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Table 4 shows why EVPI must not be used as the value of a specific study. For the same project, with the same $2,400 fee and an EVPI of $7,363, the small test is worth only $1,603, so the company would pay $2,400 for something worth $1,603; the large test, which misleads less often, is worth $4,483 and is the only profitable purchase. Claiming that "the study is worth $4,963" without asking how accurate it is takes the most optimistic upper bound as the real number.</p><h3>6.3. Three practical rules</h3><p>The two subsections above yield three rules that apply whenever a team debates paying for market research, a technical pilot or a consultant's report. This subsection states them.</p><p>First, the information most worth buying is information that could change the decision, usually information about the bad scenario; if the company would act the same way whatever the study says, the information is worth nothing. Second, EVPI is an upper bound for quick screening: any study priced above $7,363 should be rejected without further calculation. Third, for a study priced below EVPI, estimate its accuracy and compute EVSI as in Table 4; that accuracy should come from earlier test markets or from the research provider's track record, not from numbers chosen to make the case look good.</p><h2>7. Monte Carlo simulation</h2><p>Monte Carlo simulation extends scenario analysis: each input is given a probability distribution, thousands of combinations are drawn at random, the NPV is computed for each and the results form a distribution. Hertz (1979) was among the first to bring this approach into corporate capital budgeting. This section runs a simulation for the freeze-drying line and reads the results.</p><h3>7.1. Specifying distributions and correlation</h3><p>The simulation uses 10,000 draws with a fixed random seed (seed 157 in NumPy's default generator) so that anyone who reruns it gets the same numbers. Net cash flow A follows a triangular distribution with a minimum of $15,200, a most likely value of $20,800 and a maximum of $25,600 a year; investment P follows a triangular distribution of $74,000, $80,000 and $96,000, skewed toward overruns; life takes the values 6, 7, 8 and 9 years with probabilities 0.2, 0.2, 0.4 and 0.2. Salvage value stays at $8,000 and the MARR at 12%. To reflect a shared root cause such as a currency shock, the simulation specifies a correlation of &#8722;0.6 between A and P: when the investment overruns, cash flow also tends to be low. The simulation is then run again with A and P independent to see what this assumption does. Figure 4 compares the two NPV distributions.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!IUrV!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!IUrV!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png 424w, https://substackcdn.com/image/fetch/$s_!IUrV!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png 848w, https://substackcdn.com/image/fetch/$s_!IUrV!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png 1272w, https://substackcdn.com/image/fetch/$s_!IUrV!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!IUrV!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png" width="1859" height="1024" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/bbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1024,&quot;width&quot;:1859,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:85490,&quot;alt&quot;:&quot;Histogram of NPV from 10,000 draws with bars from about minus 26,000 to 64,000 dollars, bars below zero in red and above zero in teal; a dark stepped outline shows the case with A and P independent, which is narrower; a vertical line marks the mean of 18,487 dollars; a note reads probability NPV below zero 13.0 percent when correlated and 9.6 percent when independent&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Histogram of NPV from 10,000 draws with bars from about minus 26,000 to 64,000 dollars, bars below zero in red and above zero in teal; a dark stepped outline shows the case with A and P independent, which is narrower; a vertical line marks the mean of 18,487 dollars; a note reads probability NPV below zero 13.0 percent when correlated and 9.6 percent when independent" title="Histogram of NPV from 10,000 draws with bars from about minus 26,000 to 64,000 dollars, bars below zero in red and above zero in teal; a dark stepped outline shows the case with A and P independent, which is narrower; a vertical line marks the mean of 18,487 dollars; a note reads probability NPV below zero 13.0 percent when correlated and 9.6 percent when independent" srcset="https://substackcdn.com/image/fetch/$s_!IUrV!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png 424w, https://substackcdn.com/image/fetch/$s_!IUrV!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png 848w, https://substackcdn.com/image/fetch/$s_!IUrV!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png 1272w, https://substackcdn.com/image/fetch/$s_!IUrV!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fbbae77e3-3f67-4d07-b2ec-9b0e17f54f2e_1859x1024.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 4. Distribution of the freeze-drying line's NPV over 10,000 simulation draws, with and without correlation between cash flow and investment (seed 157, illustrative figures).</figcaption></figure></div><h3>7.2. Reading the simulation results</h3><p>With correlation, Figure 4 shows a mean NPV of $18,487, a standard deviation of $15,783 and a probability of loss of 13.0%; the worst 5% of draws give an NPV below &#8722;$7,995 and the best 5% give more than $44,425. When A and P are treated as independent, the mean barely moves ($18,476), but the distribution narrows, the standard deviation falls to $13,916 and the probability of loss drops to 9.6%. Ignoring correlation leaves the expected value intact but makes the probability of loss look about a quarter smaller, exactly the hidden optimism described in Section 2.3.</p><p>Three further points are worth recording. The mean NPV of $18,487 is below the base-case figure of $26,558 because the distributions lean toward the bad side: the average investment is about $83,333 rather than $80,000, and the average life is 7.6 years rather than 8. The base case in the proposal is therefore the "most likely" figure, not the expected one. The loss probability of about 13% is also far below the 25% of the three-scenario model, because that model places a quarter of the probability on a world where every input is bad at once, whereas the simulation lets inputs be partly bad and offset one another; the two numbers differ because the two sets of assumptions differ. Finally, the simulation result has its own error: with 10,000 draws the standard error of the loss probability is about 0.34 percentage points, and rerunning with 200 seeds (1 to 200) gave values between 12.2% and 14.0%, so the report should say "about 13%".</p><p>Simulation handles many inputs at once and can include correlation, precisely where one-variable analysis is weak. But its results are only as good as the distributions fed into it, and choosing those distributions usually rests on judgment; a chart built from ten thousand points easily creates a sense of precision far beyond the quality of the inputs. Flyvbjerg (2006) showed that real projects overrun costs and fall short on benefits systematically because of optimism bias, so self-specified distributions should be checked against the actual outcomes of similar completed projects, an approach he calls reference class forecasting.</p><h2>8. Adjusting the MARR for risk</h2><p>A very common way to handle risk is to add a risk premium to the MARR: riskier projects are discounted at a higher rate. This section discusses when that practice is sound and when it penalizes the wrong thing.</p><h3>8.1. When a risk premium makes sense</h3><p>The practice has a sound basis: investors demand higher returns to accept greater risk, so it is reasonable for a project that opens a new market to face a higher MARR than a routine equipment replacement (Sullivan et al., 2019). It fits when three conditions hold together: the cash flows used are expected values, not cash flows deliberately trimmed "to be safe"; the risk is tied to movements in the wider economy, as when revenue follows the business cycle; and the risk persists steadily throughout the project's life. For the freeze-drying line, adding 3 percentage points and discounting at 15% lowers NPV from $26,558 to $15,952; adding 5 points, at 17%, leaves $9,787, still positive. Companies should set premiums by project category in their investment policy in advance, rather than choosing a premium after seeing the result.</p><h3>8.2. When a risk premium misleads</h3><p>The first trap is counting the same risk twice. If the project team has already used the pessimistic cash flow of $15,200 a year instead of the expected value and then also discounts at 15%, the same risk is penalized twice: NPV is &#8722;$9,177, while the same pessimistic cash flow at the 12% MARR gives only &#8722;$1,261. The second trap is subtler: a fixed, higher discount rate penalizes distant cash flows exponentially more than near ones, even though the real risk may not grow that way. Figure 5 plots the share of a dollar's present value retained in each year when discounting at 15% or 17% instead of 12%.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!JpGM!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!JpGM!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png 424w, https://substackcdn.com/image/fetch/$s_!JpGM!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png 848w, https://substackcdn.com/image/fetch/$s_!JpGM!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png 1272w, https://substackcdn.com/image/fetch/$s_!JpGM!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!JpGM!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png" width="1726" height="994" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:994,&quot;width&quot;:1726,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:108870,&quot;alt&quot;:&quot;Line chart of two curves declining with the year in which a cash flow occurs, from 1 to 30; discounting at 15 percent instead of 12 percent retains 77 percent of present value in year 10, 59 percent in year 20 and 45 percent in year 30; discounting at 17 percent retains 65, 42 and 27 percent&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Line chart of two curves declining with the year in which a cash flow occurs, from 1 to 30; discounting at 15 percent instead of 12 percent retains 77 percent of present value in year 10, 59 percent in year 20 and 45 percent in year 30; discounting at 17 percent retains 65, 42 and 27 percent" title="Line chart of two curves declining with the year in which a cash flow occurs, from 1 to 30; discounting at 15 percent instead of 12 percent retains 77 percent of present value in year 10, 59 percent in year 20 and 45 percent in year 30; discounting at 17 percent retains 65, 42 and 27 percent" srcset="https://substackcdn.com/image/fetch/$s_!JpGM!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png 424w, https://substackcdn.com/image/fetch/$s_!JpGM!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png 848w, https://substackcdn.com/image/fetch/$s_!JpGM!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png 1272w, https://substackcdn.com/image/fetch/$s_!JpGM!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F4db9dc61-9ff8-4128-9062-c4f338fb2624_1726x994.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 5. Share of present value retained when a risk premium of 3 or 5 percentage points is added to a 12% MARR, by the year in which the cash flow occurs.</figcaption></figure></div><p>As Figure 5 shows, a 3-point premium removes only about 3% of the value of a year-1 cash flow but 23% in year 10, 41% in year 20 and 55% in year 30; with a 5-point premium, a year-30 cash flow keeps only 27% of its value. If the main risks are concentrated early, such as construction cost overruns, permitting delays or commissioning that falls short of rated capacity, a fixed premium both penalizes the truly risky phase too lightly and penalizes the stable operating years too heavily. The practice is therefore systematically biased against long-lived projects such as water treatment plants, forestry or research and development, the same problem that arises when choosing a social discount rate for public investments.</p><p>The general principle is not to pack every worry into a single discount rate. When the risks can be described, use expected cash flows with the MARR for the project category and analyze risk explicitly through sensitivity, scenarios, decision trees or simulation (Blank &amp; Tarquin, 2024). A risk premium suits steady background risk; project-specific risk, one-off risk and risk that can be reduced by buying information should be modeled separately.</p><h2>9. Building the analysis in a spreadsheet</h2><p>A spreadsheet is enough for every analysis in this article, provided each parameter sits in its own input cell and each result is a formula referring to those cells. This section presents a template.</p><p>Three Excel features are worth using: Goal Seek to find switching values, Data Table to build sensitivity tables and repeat a simulation, plus the RAND and NORM.S.INV functions to draw random numbers (Microsoft, n.d.). Table 5 lists the main cells.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/jqw7R/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/779af508-fcb6-447c-9bcf-c7cf9a7e5f6d_1220x2336.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/4586c5cf-4ffa-443b-bb86-1a72ef3de3eb_1220x2456.png&quot;,&quot;height&quot;:1246,&quot;title&quot;:&quot;Table 5. Spreadsheet model for sensitivity, scenarios, value of information and simulation&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/jqw7R/1/" width="730" height="1246" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>The trick in the last rows of Table 5 is a Data Table whose input cell is an empty cell: each row of the table forces the spreadsheet to recalculate the whole model, which means drawing a fresh set of random numbers. Because the results change every time F9 is pressed, they must be pasted as values before being reported; the LET function requires Excel 365 or Excel 2021. Google Sheets has no Data Table, but the formulas can simply be copied down 10,000 rows. When an AI assistant that can run code builds the simulation for you, ask it to print the code, the distributions, the correlation coefficient and the random seed, then check at least the base case against your own spreadsheet.</p><h2>10. Common mistakes</h2><p>Risk analysis tools are not mathematically hard, but they are easy to misuse. This section gathers the mistakes encountered in the article; Table 6 lists them with ways to avoid them.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/R9gTV/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/64369056-396a-4e95-af53-30cb56e0f283_1220x1588.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/55304aa4-9ff4-426f-afc5-9c7029376bd7_1220x1658.png&quot;,&quot;height&quot;:695,&quot;title&quot;:&quot;Table 6. Common mistakes in project risk analysis&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/R9gTV/1/" width="730" height="695" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Most of the mistakes in Table 6 share one root: turning a subjective number into one that looks objective, or counting the same risk twice. Before presenting results, ask where each probability came from, whether the inputs could worsen together for one reason, whether risk already sits in the cash flows or in the discount rate and whether the information you plan to buy could actually change the decision.</p><h2>Conclusion</h2><p>Every input to a project is a forecast, so the goal of risk analysis is not to eliminate uncertainty but to know where it lies and how large it is. Sensitivity analysis and tornado diagrams identify the critical inputs, which for the freeze-drying line are net cash flow and investment. Switching values turn that sensitivity into safety margins that managers can judge: cash flow must fall short by more than 25.7%, or the investment must overrun by more than 33.2%, before the project stops paying, and the IRR is simply the switching value of the MARR. Because safety margins do not add up, the analysis also needs consistent scenarios, expected values, standard deviations, the probability of a loss and a simulation that includes correlation. Each tool gives a different number because it rests on different assumptions, so the assumptions must be written down beside the number.</p><p>A decision tree answers whether more information is worth buying. EVPI, here $7,363, is the price ceiling for any source of information; the net gain of $4,963 holds only if the study is perfect, while a test market that can mislead must be valued through EVSI and Bayes' theorem and may not be worth its fee even when that fee is below EVPI. A risk premium in the MARR suits steady background risk applied to expected cash flows, but it double-counts when cash flows are already pessimistic and weighs too heavily on long-lived projects. The same tools carry over to public investment and public-private partnerships, where the further question is not only how large the risk is but who should bear it.</p><h2>References</h2><p>Blank, L. T., &amp; Tarquin, A. (2024). <em>Engineering economy</em> (9th ed.). McGraw Hill. <a href="https://www.mheducation.com/highered/product/engineering-economy-blank-tarquin/M9781264158096.html">https://www.mheducation.com/highered/product/engineering-economy-blank-tarquin/M9781264158096.html</a></p><p>Flyvbjerg, B. (2006). From Nobel Prize to project management: Getting risks right. <em>Project Management Journal, 37</em>(3), 5&#8211;15. <a href="https://doi.org/10.1177/875697280603700302">https://doi.org/10.1177/875697280603700302</a></p><p>Hertz, D. B. (1979). Risk analysis in capital investment. <em>Harvard Business Review, 57</em>(5), 169&#8211;181. <a href="https://hbr.org/1979/09/risk-analysis-in-capital-investment">https://hbr.org/1979/09/risk-analysis-in-capital-investment</a></p><p>Knight, F. H. (1921). <em>Risk, uncertainty and profit</em>. Houghton Mifflin. <a href="https://oll.libertyfund.org/titles/knight-risk-uncertainty-and-profit">https://oll.libertyfund.org/titles/knight-risk-uncertainty-and-profit</a></p><p>Microsoft. (n.d.). <em>Calculate multiple results by using a data table</em>. Microsoft Support. <a href="https://support.microsoft.com/en-us/office/calculate-multiple-results-by-using-a-data-table-e95e2487-6ca6-4413-ad12-77542a5ea50b">https://support.microsoft.com/en-us/office/calculate-multiple-results-by-using-a-data-table-e95e2487-6ca6-4413-ad12-77542a5ea50b</a></p><p>Newnan, D. G., Eschenbach, T. G., Lavelle, J. P., &amp; Lewis, N. A. (2020). <em>Engineering economic analysis</em> (14th ed.). Oxford University Press. <a href="https://global.oup.com/ushe/product/engineering-economic-analysis-9780190931919">https://global.oup.com/ushe/product/engineering-economic-analysis-9780190931919</a></p><p>Park, C. S. (2019). <em>Fundamentals of engineering economics</em> (4th ed., Global ed.). Pearson. <a href="https://www.pearson.com/en-gb/subject-catalog/p/fundamentals-of-engineering-economics-global-edition/P200000005189">https://www.pearson.com/en-gb/subject-catalog/p/fundamentals-of-engineering-economics-global-edition/P200000005189</a></p><p>Sullivan, W. G., Wicks, E. M., &amp; Koelling, C. P. (2019). <em>Engineering economy</em> (17th ed., Global ed.). Pearson. <a href="https://www.pearson.com/en-gb/subject-catalog/p/engineering-economy-global-edition/P200000005519/9781292264905">https://www.pearson.com/en-gb/subject-catalog/p/engineering-economy-global-edition/P200000005519/9781292264905</a></p>]]></content:encoded></item><item><title><![CDATA[Two Finance Traps: Flat-Rate Interest and Ranking Projects by IRR]]></title><description><![CDATA[How a single headline percentage hides the true cost of a loan or the value of a project, and how to check it]]></description><link>https://www.phuonglib.com/p/two-finance-traps-flat-rate-interest-and-irr</link><guid isPermaLink="false">https://www.phuonglib.com/p/two-finance-traps-flat-rate-interest-and-irr</guid><dc:creator><![CDATA[PHUONGLIB]]></dc:creator><pubDate>Fri, 27 Nov 2026 18:28:12 GMT</pubDate><enclosure url="https://substack-post-media.s3.amazonaws.com/public/images/9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp" length="0" type="image/jpeg"/><content:encoded><![CDATA[<div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!g2fq!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!g2fq!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp 424w, https://substackcdn.com/image/fetch/$s_!g2fq!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp 848w, https://substackcdn.com/image/fetch/$s_!g2fq!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp 1272w, https://substackcdn.com/image/fetch/$s_!g2fq!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp 1456w" sizes="100vw"><img src="https://substackcdn.com/image/fetch/$s_!g2fq!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp" width="2560" height="1440" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1440,&quot;width&quot;:2560,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:824320,&quot;alt&quot;:&quot;A huge blank paper price tag hanging like a theater curtain across a stage, a small woman lifting one corner to reveal orange pipes, valves and gears with coins flowing through them.&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/webp&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:false,&quot;topImage&quot;:true,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="A huge blank paper price tag hanging like a theater curtain across a stage, a small woman lifting one corner to reveal orange pipes, valves and gears with coins flowing through them." title="A huge blank paper price tag hanging like a theater curtain across a stage, a small woman lifting one corner to reveal orange pipes, valves and gears with coins flowing through them." srcset="https://substackcdn.com/image/fetch/$s_!g2fq!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp 424w, https://substackcdn.com/image/fetch/$s_!g2fq!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp 848w, https://substackcdn.com/image/fetch/$s_!g2fq!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp 1272w, https://substackcdn.com/image/fetch/$s_!g2fq!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9432aeac-9513-4c65-8bd2-dbc55afd016f_2560x1440.webp 1456w" sizes="100vw" fetchpriority="high"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><blockquote><p><strong>Key takeaways</strong></p><ul><li><p>A rate quoted without its compounding period, its basis (original or declining balance) and its fees cannot be compared with anything. Convert every offer to an effective annual rate solved from the actual cash flows.</p></li><li><p>A flat rate charges interest on the original loan even as the balance falls. Recomputed exactly, the effective annual cost is about 1.8 to 2.1 times the flat annual rate, so "roughly double" is an alarm, not a formula; fees and insurance can add close to ten more percentage points.</p></li><li><p>The internal rate of return (IRR) is the same kind of number seen from the other side: the rate that sets net present value (NPV) to zero. For a single conventional project it agrees with NPV, but ranking mutually exclusive projects by IRR is systematically biased toward small and early-paying options.</p></li><li><p>Incremental analysis fixes the ranking (always compare against the current best option), and NPV at the minimum attractive rate of return settles cases where cash flows change sign and IRR has several roots.</p></li><li><p>The common cure for both traps: write every cash flow in one column, solve for the rate with RATE, IRR or XIRR, then decide with value rather than with the most attractive percentage.</p></li></ul></blockquote><div><hr></div><p>A small print shop owner needs to borrow $800,000 and receives two offers. Bank A quotes 11% a year, compounded monthly. Bank B quotes 11.3% a year, compounded once a year. Almost everyone leans toward A, because 11 is smaller than 11.3. But at A the interest added each month starts earning interest the next month, so after twelve months the loan costs 11.57% a year, while at B it costs exactly 11.30%. The cheaper-looking offer is 0.27 percentage points more expensive, about $2,200 a year on this loan.</p><p>That gap is small. At a phone counter, a scooter dealer or in a text message offering a quick personal loan, the cost a borrower actually carries can be close to twice the number on the poster, and more once fees and insurance are added. Walk into an investment committee and the same kind of number appears in a different costume: "this project has an IRR of 28%" persuades faster than "this project has an NPV of $2,000". In a survey of 392 chief financial officers, Graham and Harvey (2001) found that about three quarters always or almost always used the internal rate of return to choose projects, roughly the same share that used net present value. Yet the most attractive percentage in the room is not always the best choice, even when every calculation behind it is correct.</p><p>The two situations share one structure. A single headline rate summarizes a stream of cash flows, and the summary hides exactly the information a decision needs: how often interest compounds, which balance it is charged on, what fees are paid up front, how large the investment is and when the money comes back. Money grows exponentially, while advertisements and intuition add in straight lines.</p><p>This article treats both traps with one toolkit. Section 1 separates nominal from effective rates and shows how to compare loan offers on a common basis. Section 2 dissects flat-rate interest and recomputes the popular "double" rule of thumb. Section 3 adds fees, insurance and "0%" offers, then works through a machine shop choosing how to finance a new machine. Section 4 turns to the project side and defines the IRR. Section 5 shows why ranking projects by IRR goes wrong, and Section 6 presents incremental analysis as the remedy. Section 7 deals with cash flows that change sign several times, the modified IRR and the reinvestment assumption. Section 8 covers irregular dates and closes with a checklist that applies to any headline rate.</p><h2>1. Nominal and effective rates</h2><p>This section explains why a rate means nothing without its compounding period and how to convert any quoted rate to a figure that can be compared.</p><h3>1.1. The rate that is quoted</h3><p>The <strong>nominal interest rate</strong> r is the annual rate quoted without counting interest earned on interest within the year. It is found by multiplying the rate per compounding period by the number of periods in a year: 1% a month is a nominal 12% a year (Park, 2019). If m is the number of compounding periods per year (1 for annual, 4 for quarterly, 12 for monthly, 365 for daily), the rate actually applied in each period is i = r / m, and a deposit P grows to F = P &#215; (1 + r/m)^(m &#215; n) after n years. Deposit $4,000 at 12% compounded monthly and after three years you have $4,000 &#215; 1.01^36 = $5,723.08, compared with $5,619.71 if interest is added once a year. The difference of $103.36 comes only from adding interest to the balance earlier.</p><p>The point to remember is that a nominal rate is a linear sum, while money grows by powers. A nominal rate is therefore incomplete until the compounding period is stated: "12% a year" alone is not enough to calculate anything.</p><h3>1.2. The rate that actually happens</h3><p>The <strong>effective interest rate</strong> is the actual growth of one unit of money over a full period, with all compounding inside that period counted. Over one year with m compounding periods:</p><p>i_effective = (1 + r/m)^m &#8722; 1</p><p>The factor (1 + r/m) is the growth over one compounding period, raising it to the power m gives growth over the year and subtracting 1 keeps only the gain (Park, 2019; Sullivan et al., 2019). At 12% compounded monthly, the effective rate is 1.01^12 &#8722; 1 = 12.68% a year.</p><p>Two rules follow. First, the effective rate of a loan is never lower than its own nominal rate and equals it only when m = 1; a smaller result signals a mistake. Second, the gap widens as r rises, because the interest on interest grows roughly with the square of r: with monthly compounding the gap is 0.17 percentage points at r = 6%, 2.82 points at 24% and 6.58 points at 36%. Table 1 shows how the effective rate changes with compounding frequency for a nominal 12%.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/MeXYV/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/18068474-4432-4ca9-a274-72e742f3582e_1220x802.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/fdbef8f4-e32f-4f43-83ee-fdcb9add591e_1220x922.png&quot;,&quot;height&quot;:435,&quot;title&quot;:&quot;Table 1. Effective annual rate for a nominal 12% a year by compounding frequency&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/MeXYV/1/" width="730" height="435" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Most of the increase in Table 1 comes in the first steps: moving from annual to semiannual compounding adds 0.36 points, while moving from monthly to daily adds less than 0.07. The bottom row is <strong>continuous compounding</strong>, the limit as the number of periods goes to infinity, where i_effective = e^r &#8722; 1 (Newnan et al., 2020). It is rare in loan contracts but useful as a ceiling: if a calculation gives an effective rate above e^r &#8722; 1, where r is the loan's true nominal rate, the calculation is wrong. Section 2 shows why the qualifier "true" matters, since an advertised flat rate is not the loan's nominal rate.</p><p>Converting between periods follows the same logic. An effective rate of 1% a month equals 1.01^3 &#8722; 1 = 3.03% a quarter and 12.68% a year; in the other direction, 12.68% a year equals 1.1268^(1/12) &#8722; 1 = 1% a month. Multiplying 1% by 3 to get 3% a quarter is wrong, because that multiplication is exactly the operation that creates a nominal rate. In short: multiplying gives nominal figures, raising to a power gives effective ones.</p><p>One more distinction prevents confusion. An <em>effective</em> rate includes the effect of compounding; a <em>real</em> rate removes the effect of inflation. Converting to effective can only raise a rate or leave it unchanged, while converting to real lowers it when inflation is positive. When both are needed, convert to effective first and then remove inflation. Every effective rate in this article is before inflation.</p><h3>1.3. Comparing offers on one yardstick</h3><p>With the formula in hand, comparing offers becomes mechanical, under one strict rule: compare alternatives only through effective rates for the same period. Comparing two nominal rates with different compounding is like comparing 11 meters with 11.3 feet. In the opening example, A has an effective rate of (1 + 0.11/12)^12 &#8722; 1 = 11.57% and B has 11.30%, so B is cheaper. A would have to cut its quoted rate to 12 &#215; (1.113^(1/12) &#8722; 1) &#8776; 10.75% compounded monthly just to match B. Table 2 extends the comparison to four hypothetical working capital loans.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/UOg4N/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/63e4bae0-72ca-4ce4-a095-2fcad4b73ecf_1220x544.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/ad287b29-78a0-41d0-bb36-e01df3fa1f5d_1220x664.png&quot;,&quot;height&quot;:306,&quot;title&quot;:&quot;Table 2. Four loan offers converted to effective annual rates (illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/UOg4N/1/" width="730" height="306" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>The ranking in Table 2 nearly reverses the order of the quoted numbers: the 10.8% offer only comes second, and the 10.9% offer compounded daily is the most expensive.</p><p>A second mismatch is common in engineering problems: cash flows occur on one schedule and interest compounds on another, for example a loan compounded monthly but repaid quarterly. The rule is to change the rate to fit the cash flows, not the cash flows to fit the rate. With p payments a year, the rate per payment period is i = (1 + r/m)^(m/p) &#8722; 1 (Sullivan et al., 2019). A haulage firm that borrows $16,000 for a light truck at 15% compounded monthly, repaid quarterly over five years because its contracts pay quarterly, faces a quarterly rate of (1 + 0.15/12)^3 &#8722; 1 = 3.797% and a payment of $1,156.25 per quarter over 20 quarters. Dividing 15% by 4 instead gives 3.75% and a payment of $1,151.39, about $4.86 short each quarter and roughly $97 over the life of the loan. The safeguard is to write the time unit next to every rate and check that i and n use the same unit before calculating.</p><h2>2. The flat-rate trap</h2><p>In consumer credit and equipment installment plans, one way of quoting interest opens a gap far larger than compounding frequency. This section explains the mechanism, works through an example and tests the popular rule that the true rate is "about double".</p><h3>2.1. How a flat rate works</h3><p>Under a <strong>flat rate</strong> f per period, a loan P over n periods is charged interest of P &#215; f every period, no matter how much principal has already been repaid. Total interest is P &#215; f &#215; n and the payment each period is A = P &#215; (1 + f &#215; n) / n. Under a <strong>declining balance</strong> loan, interest each period equals the remaining balance times the rate, so interest falls as principal is repaid; this is what the standard annuity formula A = P &#215; (A/P, i, n) assumes.</p><p>A flat rate is not fraud; it is a convention, and contracts usually state it. The problem arises when borrowers compare a flat rate with a declining balance rate, two quantities of different kinds. Figure 1 shows the gap between the balance on which interest is charged and the balance the borrower actually owes.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!7lxR!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!7lxR!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png 424w, https://substackcdn.com/image/fetch/$s_!7lxR!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png 848w, https://substackcdn.com/image/fetch/$s_!7lxR!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png 1272w, https://substackcdn.com/image/fetch/$s_!7lxR!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!7lxR!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png" width="1762" height="1044" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1044,&quot;width&quot;:1762,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:100399,&quot;alt&quot;:&quot;Bar chart over 12 months: the principal actually owed falls in steps of 200 dollars from 2,400 to 200, while a dashed red line shows flat-rate interest still charged on 2,400 dollars; the pink part of each bar is principal already repaid; a dotted line marks the average balance actually owed of 1,300 dollars&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Bar chart over 12 months: the principal actually owed falls in steps of 200 dollars from 2,400 to 200, while a dashed red line shows flat-rate interest still charged on 2,400 dollars; the pink part of each bar is principal already repaid; a dotted line marks the average balance actually owed of 1,300 dollars" title="Bar chart over 12 months: the principal actually owed falls in steps of 200 dollars from 2,400 to 200, while a dashed red line shows flat-rate interest still charged on 2,400 dollars; the pink part of each bar is principal already repaid; a dotted line marks the average balance actually owed of 1,300 dollars" srcset="https://substackcdn.com/image/fetch/$s_!7lxR!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png 424w, https://substackcdn.com/image/fetch/$s_!7lxR!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png 848w, https://substackcdn.com/image/fetch/$s_!7lxR!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png 1272w, https://substackcdn.com/image/fetch/$s_!7lxR!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F5ec2d09f-a255-401a-b53c-75ac0fbcc666_1762x1044.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 1. A flat rate charges interest on the full original loan while the balance actually owed declines; the pink area is principal already repaid but still charged interest (illustrative figures).</figcaption></figure></div><h3>2.2. A $2,400 loan at 1% a month flat</h3><p>Figure 1 is based on a $2,400 loan over 12 months at a flat 1% a month, which sounds very close to a bank's "12% a year". Total interest is $288 and each monthly payment is ($2,400 + $288) / 12 = $224. The principal actually owed falls by $200 a month and averages only $1,300 over the year, about 54% of the amount borrowed, yet interest is charged on $2,400 throughout.</p><p>To find the effective rate, set the amount received today equal to the present value of the payments: 2,400 = 224 &#215; (P/A, i, 12). Solving gives i &#8776; 1.79% a month, or 1.0179^12 &#8722; 1 &#8776; 23.70% a year. If the same $2,400 were borrowed at 1% a month on a declining balance, the payment would be only $213.24 and total interest $158.85 instead of $288.</p><p>The same loan therefore carries three numbers: 12% (the flat annual rate used in advertising), 1.79% &#215; 12 = 21.46% (the nominal annual rate on the declining balance) and 23.70% (the effective annual rate). Only the third can be compared directly with the effective rate of another option.</p><h3>2.3. The "double" rule, recomputed</h3><p>A popular rule of thumb says that the true rate on a flat-rate loan is roughly twice the quoted figure, and that the approximation improves as the term lengthens. The argument sounds reasonable: the average balance is P &#215; (n + 1) / (2n), so the declining balance rate is about f &#215; 2n / (n + 1), and the ratio 2n / (n + 1) approaches 2 as n grows. Table 3 tests the rule by solving the present value equation exactly for the $2,400 loan at a flat 1% a month over different terms.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/XfLAn/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/c49d2039-c61d-4570-a85f-c06141c306c7_1220x690.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/d554e4be-5140-460d-960e-ae584c13bde8_1220x810.png&quot;,&quot;height&quot;:398,&quot;title&quot;:&quot;Table 3. Effective rate of a $2,400 loan at a flat 1% a month by term (illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/XfLAn/1/" width="730" height="398" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Table 3 rejects the second half of the rule. The rule-of-thumb estimate rises steadily with the term, but the true effective monthly rate rises only until about 18 to 24 months and then falls: at 60 months it is 1.69%, the same as at 6 months. The reason is that the average balance argument ignores the time value of money. With a long term, most of the payments arrive in later years and are discounted heavily, so the rule's error grows with the term rather than shrinking.</p><p>Extending the calculation to flat rates from 0.5% to 2% a month gives three more precise conclusions. First, measured per month, the effective rate never reaches twice the flat rate: the ratio peaks at about 1.85 for a 0.5% flat rate (around 26 months), 1.80 for 1% (around 18 months), 1.77 for 1.5% and 1.74 for 2% (around 13 to 15 months). Second, the higher the flat rate, the lower the ratio and the earlier its peak. Third, at long terms the ratio falls clearly: at 2% a month over 60 months it is only 1.53.</p><p>People still say "double" because compounding to an annual figure makes up part of the shortfall: 23.70% divided by 12% is 1.98. Across flat rates of 0.5% to 2% a month and terms of 6 to 60 months, the effective annual rate is about 1.8 to 2.1 times the flat annual rate. The right use of the rule is as an alarm: a flat rate signals that the true cost is close to double, and the present value equation then gives the number to use in analysis.</p><h3>2.4. What disclosure rules require</h3><p>Many jurisdictions require lenders to disclose a standardized rate precisely so that borrowers do not have to do this algebra, but the standards differ. In the United States, the Truth in Lending Act, implemented by Regulation Z, defines the annual percentage rate (APR) as a measure of the cost of credit expressed as a yearly rate. For closed-end loans it is found by solving for the rate per payment period from the amounts and timing of the money received and paid, then multiplying that rate by the number of periods in a year (Consumer Financial Protection Bureau, n.d.-a). A US APR is therefore a nominal rate on the declining balance, the "i &#215; 12" column of Table 3, with finance charges such as fees built in. Regulation Z also requires that a rate stated in a credit advertisement be given as an "annual percentage rate" (Consumer Financial Protection Bureau, n.d.-b).</p><p>The European Union's Consumer Credit Directive takes the further step. Its annual percentage rate of charge (APRC) equates, on an annual basis, the present value of the amounts drawn down with the present value of repayments and charges, so it is an effective annual rate that includes the total cost of credit (European Parliament and Council of the European Union, 2008). Directive (EU) 2023/2225 replaces the 2008 directive from 20 November 2026 and keeps the APRC as the comparison measure (European Parliament and Council of the European Union, 2023). For the $2,400 loan, a US-style APR would read 21.46% and an EU-style APRC 23.70%. Both are far more honest than "1% a month", but they are not the same number, and comparing an APR from one system with an APRC from the other repeats the mistake of Section 1.</p><p>Where such rules are weak or loosely enforced, or where a seller quotes "only $224 a month", the flat rate or the payment is all the borrower sees. The principle does not depend on the jurisdiction: whatever is printed, the borrower can always recover the effective rate from the cash flows.</p><h2>3. Fees, insurance and "0%" offers</h2><p>The interest rate is only part of the cost of borrowing. This section shows how upfront fees, loan insurance and even "0%" offers change the effective rate, then applies the method to a real financing choice.</p><h3>3.1. Every dollar goes into the cash flow</h3><p>Appraisal fees, arrangement fees and insurance do not change the repayment schedule, but they reduce the money actually received or increase the money paid. Borrow $2,400 for 12 months at 1% a month on a declining balance and the payment is $213.24. If a 2% fee is deducted at disbursement, the borrower receives only $2,352. Solving 2,352 = 213.24 &#215; (P/A, i, 12) gives i &#8776; 1.32% a month, or 17.06% a year instead of 12.68%: a 2% fee adds more than four percentage points to the cost of a short loan.</p><p>The general principle is that every amount the borrower receives or pays, at any time, belongs in the cash flow before the effective rate is solved. If the cash price is lower than the installment price, the real amount "borrowed" is the cash price. If insurance is added to the principal, the borrower pays interest on the insurance too.</p><h3>3.2. Five consumer offers</h3><p>Table 4 converts five hypothetical offers to the same yardstick. The rates, fees and insurance charges are illustrative and do not represent any particular lender.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/8ZUeC/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/8eca5c67-08e3-4459-8a49-5653d1d3e679_1220x1454.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/66901d0e-5a4e-4e85-b629-9d55865ecff1_1220x1574.png&quot;,&quot;height&quot;:721,&quot;title&quot;:&quot;Table 4. Effective annual rates of five consumer installment offers (illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/8ZUeC/1/" width="730" height="721" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Table 4 shows that the scooter loan at "only 1.2% a month" (14.4% a year) has an effective rate of 29.00%, higher than the personal loan at "2% a month" (26.82%), even though its quoted number is much lower. The 5% insurance added to principal alone pushes the scooter loan to 37.82%, because the insurance both increases the principal and is charged flat interest for 18 months. Figure 2 places the advertised number next to the effective annual rate of each offer.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!-iH3!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!-iH3!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png 424w, https://substackcdn.com/image/fetch/$s_!-iH3!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png 848w, https://substackcdn.com/image/fetch/$s_!-iH3!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png 1272w, https://substackcdn.com/image/fetch/$s_!-iH3!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!-iH3!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png" width="1769" height="1047" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1047,&quot;width&quot;:1769,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:103499,&quot;alt&quot;:&quot;Grouped bar chart comparing the advertised annual rate with the effective annual rate for five offers: phone 0% versus 5.8%, scooter loan 14.4% versus 29.0% and 37.8% with insurance, personal loan 24.0% versus 26.8% and 33.8% with upfront fee and insurance&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Grouped bar chart comparing the advertised annual rate with the effective annual rate for five offers: phone 0% versus 5.8%, scooter loan 14.4% versus 29.0% and 37.8% with insurance, personal loan 24.0% versus 26.8% and 33.8% with upfront fee and insurance" title="Grouped bar chart comparing the advertised annual rate with the effective annual rate for five offers: phone 0% versus 5.8%, scooter loan 14.4% versus 29.0% and 37.8% with insurance, personal loan 24.0% versus 26.8% and 33.8% with upfront fee and insurance" srcset="https://substackcdn.com/image/fetch/$s_!-iH3!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png 424w, https://substackcdn.com/image/fetch/$s_!-iH3!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png 848w, https://substackcdn.com/image/fetch/$s_!-iH3!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png 1272w, https://substackcdn.com/image/fetch/$s_!-iH3!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F2e96bd89-ec84-47a9-b5a1-662acb1aac04_1769x1047.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 2. Advertised rate and effective annual rate of five installment offers (illustrative figures).</figcaption></figure></div><p>Figure 2 also shows that "0%" is not always free. A 3% conversion fee paid up front turns the 0% offer on a $960 phone into a loan with an effective rate of 5.81% a year. If the store also gives a 5% discount to customers who pay cash (a cash price of $912) and installment buyers do not get it, the real amount borrowed is only $912 and the effective rate rises to 10.01% a year.</p><p>Why do borrowers underestimate these costs so easily? Stango and Zinman (2009) describe <strong>exponential growth bias</strong>: people tend to think about interest linearly, so when they see only a loan's payments they infer an interest rate lower than the true one. Households with stronger bias also tend to borrow more and save less. A flat rate fits this linear thinking perfectly, because it puts the multiplication P &#215; f &#215; n front and center. The effective remedy is not better mental arithmetic but putting the cash flows into a spreadsheet.</p><h3>3.3. Solving for the rate in a spreadsheet</h3><p>Spreadsheets provide functions for each conversion in this article: EFFECT turns a nominal rate into an effective annual rate, NOMINAL does the reverse, RATE finds the rate per period of a level payment series and IRR finds the rate per period of any cash flow column (Blank &amp; Tarquin, 2024). For the insured scooter loan, the principal on which interest is charged is $1,120 &#215; 1.05 = $1,176, the payment is $1,176 &#215; (1 + 1.2% &#215; 18) / 18 = $79.45, and =RATE(18, -79.45, 1120) returns 2.71% a month, which =(1 + 2.71%)^12 &#8722; 1 turns into 37.82% a year. Writing the same loan as a column (+1,120 in month 0 and &#8722;79.45 in months 1 to 18) and applying =IRR to it gives the same 2.71%, and the column version keeps working when fees fall mid-term or a balloon payment comes at the end.</p><p>Three errors are common. The first is the sign convention: money received is positive and payments are negative, and if all values share a sign the function returns an error. The second is the period of the result: RATE and IRR return a rate per cash flow period (here a month), while EFFECT returns an annual rate. The third is entering the nominal loan amount instead of the amount actually received when fees are deducted up front. Three quick checks catch most remaining mistakes, including those made by AI assistants that summarize a contract: is the result lower than the loan's own nominal rate (then it is wrong), is it above e^r &#8722; 1 for that loan (also wrong) and, for a flat-rate loan, is the annual result roughly 1.8 to 2.1 times the flat annual rate (if not, look again).</p><h3>3.4. A machine shop chooses how to pay for a machine</h3><p>The principles matter most when several offers arrive at once. A small machine shop needs a CNC milling machine with a list price of $20,000 (illustrative figures). The supplier offers three ways to pay: cash with a 6% discount, that is $18,800; 24 monthly installments at a flat 0.7% a month on the list price; or "0%" over 12 months on the list price. The shop does not have $18,800 on hand, but its bank will lend exactly the cash price at 12% a year on a declining balance, repaid monthly over 24 months, with a 1% arrangement fee deducted at disbursement. Because the cash price is $18,800, every option must be measured against a real loan of $18,800. Table 5 summarizes the results.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/PxDcK/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/295af0df-94e1-4ae1-87a5-b6d2340cde2d_1220x1002.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/f5776233-1a22-42ab-9948-c997fd1a4e65_1220x1122.png&quot;,&quot;height&quot;:454,&quot;title&quot;:&quot;Table 5. Three ways to finance the CNC machine converted to effective annual rates (illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/PxDcK/1/" width="730" height="454" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Two points stand out in Table 5. Option B, advertised at "0.7% a month" (8.4% a year) and sounding cheaper than the bank, is the most expensive: measured on the list price its effective rate is already 16.51%, and against the cash price it reaches 24.10% a year, because the installment buyer also gives up the $1,200 discount. Option C looks free but is not: the discount forgone is equivalent to an effective rate of 12.21% a year, though it is still slightly cheaper than the bank (13.82%).</p><p>The last column checks the same conclusion another way. Discounting every payment (and the bank fee) to today at 1% a month, the shop's assumed cost of capital, the option with the lowest present value is the cheapest. The order is again C, A and then B.</p><p>The cheapest option is not necessarily the right one. Option C requires $1,666.67 a month for 12 months, almost double the payment under A. If the new machine generates only about $1,200 a month of extra cash in its first year, the shop must cover the shortfall from working capital, possibly with short-term borrowing at a much higher rate, and a 1.6 point advantage of C over A is not worth the risk of running out of cash. The effective rate answers "which option is cheaper"; "which option fits" also needs the firm's own cash flow plan. Four questions apply to any financing offer: Is interest charged on the original or the declining balance? How often does interest compound and how often are payments made? Do fees, insurance or a forgone cash discount change the amount actually received? How long does the promotional rate last and what happens afterward?</p><h2>4. The internal rate of return: the same number from the other side</h2><p>Everything so far has solved for the rate hidden in a loan. A project's cash flow can be read the same way, and the resulting rate is the internal rate of return. This section defines it, shows how to find it and states when its decision rule works.</p><h3>4.1. Definition and the NPV profile</h3><p>The <strong>internal rate of return</strong> of a project is the rate i* at which its net present value equals zero: the sum of A_t / (1 + i*)^t for t from 0 to n is zero, where A_t is the net cash flow in year t (receipts positive, payments negative). Because the annual worth is just the present worth multiplied by a positive factor, setting annual worth to zero gives the same result (Park, 2019). The word "internal" means the rate depends only on the project's cash flows: computing NPV requires the <strong>minimum attractive rate of return</strong> (MARR), computing the IRR does not. The MARR enters only at the next step, when the IRR is compared with it.</p><p>Consider a furniture workshop thinking about a CNC router that costs $20,000. By cutting panels faster and with less waste, the machine adds about $5,600 of net cash flow a year for six years and has no salvage value (illustrative figures). If NPV is computed at many discount rates and the points are joined, the result is the <strong>NPV profile</strong> (present worth profile). For a cash flow that pays out first and receives later, the profile slopes down: the higher the discount rate, the more heavily future receipts are discounted, while the year 0 outlay stays the same. The IRR is the point where the profile crosses the horizontal axis, here 17.19%. At a MARR of 10%, NPV = &#8722;20,000 + 5,600 &#215; (P/A, 10%, 6) = &#8722;20,000 + 5,600 &#215; 4.3553 = $4,389.</p><p>A second interpretation is closer to the economics. Treat the project as a loan the owner makes to the machine. Each year the capital not yet recovered earns interest at i*, then the cash the machine brings back is subtracted. The IRR is the rate at which this unrecovered balance reaches exactly zero at the end of the project (Newnan et al., 2020). For the router, the balance falls from $20,000 at the start to $17,838 after year 1, $12,336 after year 3, $4,779 after year 5 and zero after year 6. So 17.19% is the rate earned on the capital still inside the project at each moment, not on the full $20,000 for six years. This is why an IRR can be compared directly with a loan rate: both are rates on a declining balance, exactly the kind of rate Section 2 recovered from a flat-rate loan.</p><h3>4.2. Finding the IRR</h3><p>The IRR equation is a polynomial of degree n and in general has no closed-form solution. By hand, guess a rate and compute NPV (positive means the IRR is higher, negative means lower), bracket the root between a rate with positive NPV and one with negative NPV, then interpolate linearly. For the router, NPV is $634.52 at 16% and &#8722;$413.43 at 18%, so the interpolation 16% + 634.52 / (634.52 + 413.43) &#215; 2% gives 17.21%, only 0.02 points from the exact 17.19%. Interpolation is only an approximation: the NPV profile of a conventional cash flow is convex, so a chord between two trial points lies above the curve and crosses the axis late, and the error grows quickly when the trial rates are far apart. Interpolating between 10% and 25% gives 18.38%, more than a point too high.</p><p>In Excel or Google Sheets, the function IRR(values, [guess]) solves the equation iteratively and returns a rate per period (Microsoft, n.d.-a). With &#8722;20,000 in the year 0 cell and 5,600 in the next six cells, =IRR(B2:B8) returns 17.19%. For a level series, RATE gives the same answer, as it did for the loans in Section 3. Unlike the NPV function, IRR includes the year 0 amount; it assumes the cells are one period apart, so monthly cash flows produce a monthly rate that must be converted with (1 + i_month)^12 &#8722; 1; and the guess can usually be left blank, except for cash flows that change sign several times (Section 7).</p><h3>4.3. The decision rule and where it reverses</h3><p>For a single project with a conventional cash flow, the rule is to accept if the IRR is at least the MARR and reject otherwise. The router's IRR of 17.19% exceeds the workshop's 10% MARR, so the machine is worth buying, and its NPV at 10% ($4,389) is positive as well. The agreement is no accident: the profile slopes down and crosses zero exactly at the IRR, so every MARR below the IRR gives a positive NPV. The gap between IRR and MARR also measures a safety margin: the router remains worthwhile as long as the cost of capital stays below 17.19%, so the MARR could rise by more than seven points before the conclusion changes. This is the most useful way to present an IRR.</p><p>The agreement has three limits. The first is a borrowing-type cash flow: money received first and paid back later. The $2,400 flat-rate loan of Section 2 has an IRR of 1.79% a month, an effective 23.70% a year. For the borrower the NPV profile slopes upward, so the rule reverses: accept a loan only when its IRR, which is the effective cost of borrowing, is below the MARR. Applying "the higher the IRR the better" mechanically would pick the most expensive loan on the market. The second limit is a cash flow that changes sign more than once, covered in Section 7. The third, and the most important in practice, is a choice among several alternatives. Independent projects with unlimited capital: do every project whose IRR is at least the MARR. <strong>Mutually exclusive</strong> alternatives, where only one can be chosen because they share the same site, team or need: ranking by IRR can be wrong, and incremental analysis or NPV is required. Independent projects with a limited budget: choose the combination with the largest total NPV within the budget; ranking by IRR is then only an approximation (Sullivan et al., 2019).</p><h2>5. The ranking trap: the highest percentage is not the best project</h2><p>Faced with several alternatives, the natural instinct is to rank them by IRR and take the top one. This section shows that the instinct fails systematically for two reasons, differences in scale and differences in timing, and introduces the Fisher intersection that links them.</p><h3>5.1. Conflict caused by scale</h3><p>The owner of a small caf&#233; chain has just leased a corner site on a five-year lease and has two ways to use it (illustrative figures). Option X is a takeaway kiosk costing $4,000 that generates $1,600 of net cash flow a year. Option Y is a sit-down caf&#233; costing $12,000 that generates $3,800 a year. There is only one site, so the options are mutually exclusive, and the owner's MARR is 10%. Table 6 computes both measures for each option and for the difference between them.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/6JPVo/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/e5d8531c-5f09-41d3-836d-073d5a9b6edb_1220x720.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/5fcbad00-acd3-463b-95e9-0c6056108086_1220x840.png&quot;,&quot;height&quot;:378,&quot;title&quot;:&quot;Table 6. Two uses of the caf&#233; site, MARR 10%, five years (illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/6JPVo/1/" width="730" height="378" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>The two measures in Table 6 point in opposite directions. The right answer is Y, because the goal is to maximize the value created, not the percentage earned on a small amount of capital. Earning 28.65% on $4,000 creates less value than earning 17.57% on $12,000. If the owner chooses X, the remaining $8,000 earns only the MARR elsewhere, which adds nothing to NPV. Figure 3 shows where the conflict comes from.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!htiM!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!htiM!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png 424w, https://substackcdn.com/image/fetch/$s_!htiM!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png 848w, https://substackcdn.com/image/fetch/$s_!htiM!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png 1272w, https://substackcdn.com/image/fetch/$s_!htiM!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!htiM!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png" width="1798" height="1026" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1026,&quot;width&quot;:1798,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:143953,&quot;alt&quot;:&quot;Line chart of two NPV profiles against the discount rate from 0 to 32 percent: the sit-down caf&#233; Y starts at 7,000 dollars and falls steeply, crossing zero at 17.57 percent; the takeaway kiosk X starts at 4,000 dollars, falls more gently and crosses zero at 28.65 percent; the two curves cross at the Fisher intersection of 11.65 percent, to the right of a dotted line marking the 10 percent MARR&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Line chart of two NPV profiles against the discount rate from 0 to 32 percent: the sit-down caf&#233; Y starts at 7,000 dollars and falls steeply, crossing zero at 17.57 percent; the takeaway kiosk X starts at 4,000 dollars, falls more gently and crosses zero at 28.65 percent; the two curves cross at the Fisher intersection of 11.65 percent, to the right of a dotted line marking the 10 percent MARR" title="Line chart of two NPV profiles against the discount rate from 0 to 32 percent: the sit-down caf&#233; Y starts at 7,000 dollars and falls steeply, crossing zero at 17.57 percent; the takeaway kiosk X starts at 4,000 dollars, falls more gently and crosses zero at 28.65 percent; the two curves cross at the Fisher intersection of 11.65 percent, to the right of a dotted line marking the 10 percent MARR" srcset="https://substackcdn.com/image/fetch/$s_!htiM!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png 424w, https://substackcdn.com/image/fetch/$s_!htiM!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png 848w, https://substackcdn.com/image/fetch/$s_!htiM!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png 1272w, https://substackcdn.com/image/fetch/$s_!htiM!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F130f53d5-0ebf-4264-a717-2c5c3ace21f3_1798x1026.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 3. Conflict caused by scale: the two NPV profiles cross at the Fisher intersection of 11.65% (illustrative figures).</figcaption></figure></div><p>As Figure 3 shows, Y's profile is steeper because its total cash flow is larger, which makes it more sensitive to the discount rate. The two curves cross at 11.65%, the <strong>Fisher intersection</strong>. To the left, when the MARR is below 11.65%, Y creates more value; to the right, X takes the lead. At a MARR of 12%, X has an NPV of $1,768 and Y $1,698, so X becomes the right choice. The IRR looks only at where each curve crosses the axis and ignores the whole stretch of curve in the range of realistic MARRs, so it cannot see any of this.</p><h3>5.2. Conflict caused by timing</h3><p>Rankings can also flip when two alternatives need the same investment but return money at different times. A small software company has $16,000 and one development team, enough for only one of two directions over four years (illustrative figures). Direction E takes a long-term outsourcing contract for a foreign client: cash arrives quickly and then shrinks as the client squeezes prices, at $10,000, $6,000, $3,200 and $1,600. Direction L builds the company's own subscription software: only $1,200 in year 1, rising to $3,600, $7,600 and $12,800 as customers sign up.</p><p>The outsourcing direction E has an IRR of 16.06%, higher than the product direction L at 15.18%. But at a MARR of 10%, E's NPV is only $1,547 while L's is $2,519. Because L's cash arrives late, its NPV profile is steeper: at low discount rates L wins on its larger total receipts ($25,200 against $20,800), at high rates the late receipts are discounted heavily and E pulls ahead; the two curves cross at 14.17%. At a MARR of 15%, E's NPV is $251 and L's only $81.</p><p>The IRR favors early-paying alternatives because it measures each alternative at its own discount rate, while NPV discounts both at the same MARR. Beyond the numbers, risk also matters: the rising cash flow of a new product is less certain than an outsourcing contract, which a sensitivity analysis should capture.</p><h3>5.3. What the Fisher intersection tells you</h3><p>At the Fisher intersection the two alternatives have equal NPV: NPV(Y) = NPV(X), so NPV(Y &#8722; X) = 0, which is exactly the definition of the IRR of the difference. The 11.65% intersection in Figure 3 is therefore the IRR of the increment in the last column of Table 6. A rule worth remembering: if the MARR lies to the left of the intersection, choose the alternative with the larger total cash flow (usually the larger or later-paying one); if it lies to the right, choose the other. Both intersections in these examples fall between 10% and 15%, the range of MARRs many firms use, so the conflict is not a curiosity.</p><h2>6. Incremental analysis: asking whether the extra money is worth it</h2><p>There is a way to use IRR that still gives the right answer for mutually exclusive alternatives: instead of asking which alternative earns the higher rate, ask whether the additional investment is worth making. This section presents the procedure of <strong>incremental analysis</strong> and the most common error in applying it.</p><h3>6.1. The four-step procedure</h3><p>The procedure has four steps (Blank &amp; Tarquin, 2024). First, order the alternatives by investment from smallest to largest and drop any whose IRR is below the MARR. Second, take the smallest remaining alternative as the <strong>current best</strong> (often called the defender). Third, form the incremental cash flow between the next alternative and the current best, and compute its IRR; if the incremental IRR is at least the MARR, the larger alternative becomes the current best, otherwise the current best stays. Fourth, repeat to the end of the list; the last current best is the choice.</p><p>For the caf&#233; site, the increment Y &#8722; X invests an extra $8,000 to receive an extra $2,200 a year, with an incremental IRR of 11.65%, above the 10% MARR. The extra capital is worth investing, so Y is chosen and the result matches NPV. When alternatives have different lives, the incremental cash flow must be built over a common analysis period, using the least common multiple of the lives or a stated study period.</p><h3>6.2. Four warehouse automation options</h3><p>A consumer goods distributor wants to cut labor costs and picking errors in its warehouse and has four mutually exclusive levels of investment, all lasting five years (illustrative figures): A adds barcode scanners and software ($8,000, saving $2,400 a year); B also adds a sorting conveyor ($14,000 and $4,000); C adds partly automated racks ($20,000 and $5,520); D is high-level automation ($26,000 and $7,120). The MARR is 10%, and (P/A, 10%, 5) = 3.7908. Table 7 sets out each step.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/iq536/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/f7ca8ca8-bf40-44e2-b5f0-13ee3b127ba3_1220x1144.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/018c79c9-d5b0-4673-b65a-cddbee8bb11b_1220x1264.png&quot;,&quot;height&quot;:545,&quot;title&quot;:&quot;Table 7. Incremental analysis of four warehouse automation options, MARR 10%, five years (illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/iq536/1/" width="730" height="545" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>If the distributor simply picked the highest IRR, it would choose A at 15.24% and give up about $65 of present value compared with B. Incremental analysis chooses B, the alternative with the largest NPV. Note that C and D each have an IRR above the MARR, so on their own they would look "worth doing"; but the extra capital needed to move from B to C or to D earns less than 10%, so it is not worth spending. Figure 4 traces the comparisons.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!4A1q!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!4A1q!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png 424w, https://substackcdn.com/image/fetch/$s_!4A1q!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png 848w, https://substackcdn.com/image/fetch/$s_!4A1q!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png 1272w, https://substackcdn.com/image/fetch/$s_!4A1q!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!4A1q!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png" width="2137" height="984" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/d85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:984,&quot;width&quot;:2137,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:165924,&quot;alt&quot;:&quot;Diagram of four boxes for options A, B, C and D ordered by cost of 8,000, 14,000, 20,000 and 26,000 dollars with their IRR and NPV; a green connector B &#8722; A with an incremental IRR of 10.42 percent keeps B; two red connectors C &#8722; B at 8.43 percent and D &#8722; B at 9.43 percent both still keep B; above, a dashed orange connector labeled as wrong compares D with C at 10.42 percent and chooses D by mistake&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Diagram of four boxes for options A, B, C and D ordered by cost of 8,000, 14,000, 20,000 and 26,000 dollars with their IRR and NPV; a green connector B &#8722; A with an incremental IRR of 10.42 percent keeps B; two red connectors C &#8722; B at 8.43 percent and D &#8722; B at 9.43 percent both still keep B; above, a dashed orange connector labeled as wrong compares D with C at 10.42 percent and chooses D by mistake" title="Diagram of four boxes for options A, B, C and D ordered by cost of 8,000, 14,000, 20,000 and 26,000 dollars with their IRR and NPV; a green connector B &#8722; A with an incremental IRR of 10.42 percent keeps B; two red connectors C &#8722; B at 8.43 percent and D &#8722; B at 9.43 percent both still keep B; above, a dashed orange connector labeled as wrong compares D with C at 10.42 percent and chooses D by mistake" srcset="https://substackcdn.com/image/fetch/$s_!4A1q!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png 424w, https://substackcdn.com/image/fetch/$s_!4A1q!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png 848w, https://substackcdn.com/image/fetch/$s_!4A1q!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png 1272w, https://substackcdn.com/image/fetch/$s_!4A1q!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2Fd85f04d0-d2a6-4847-908f-61bada643e7a_2137x984.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 4. Incremental analysis of the four warehouse options: each step compares with the current best, not with the option listed just before (illustrative figures).</figcaption></figure></div><h3>6.3. Comparing against the wrong baseline</h3><p>Figure 4 also records the most common procedural error: comparing a new alternative with the one listed just before it instead of with the current best. At step 5, comparing D with C gives an increment of $6,000 invested for $1,600 a year, an incremental IRR of 10.42%, above the MARR, so the analyst would choose D. But C was already rejected at step 4; the correct baseline is B. Choosing D gives an NPV of $990, about $173 less than B. A second error is forgetting that an incremental cash flow can itself change sign several times, especially when the two alternatives have different lives or patterns of receipts; it must then be checked as in Section 7.</p><p>Incremental analysis gives the right answer but takes more effort than NPV, so many firms decide with NPV and use the incremental IRR to explain the decision: "moving up to option B means investing another $6,000, and that extra capital earns 10.42%, just above the MARR".</p><h2>7. When cash flows change sign more than once</h2><p>The second project-side trap appears when a cash flow changes sign several times. This section explains why a project can have more than one IRR, how to detect the problem early and what to report instead.</p><h3>7.1. Counting sign changes</h3><p>A conventional cash flow changes sign exactly once: money out first, money in later. Many real projects do not behave that way: a quarry must pay for site restoration when it closes, a production line needs a major overhaul halfway through its life, a contract collects a deposit before spending money to deliver. The IRR equation may then have several roots. <strong>Descartes' rule of signs</strong> says that the number of real IRRs greater than &#8722;100% cannot exceed the number of sign changes in the cash flow (Newnan et al., 2020). It is only an upper bound: two sign changes can produce two, one or no roots.</p><p>A complementary test is the <strong>cumulative cash flow criterion</strong> of Norstrom (1972): if the running total of the cash flow starts negative and changes sign only once, the project has exactly one positive IRR. Suppose the router from Section 4 needed a $7,200 overhaul in year 3. Its net cash flow becomes &#8722;20,000, 5,600, 5,600, &#8722;1,600, 5,600, 5,600, 5,600: three sign changes, so Descartes' rule cannot exclude three roots. But the cumulative cash flow is &#8722;20,000, &#8722;14,400, &#8722;8,800, &#8722;10,400, &#8722;4,800, 800, 6,400, which changes sign only once, so the IRR is unique: 8.28%. The overhaul pulls the IRR from 17.19% to below the 10% MARR, and NPV at 10% becomes &#8722;$1,020. Leaving the overhaul out of the cash flow would hide this conclusion entirely.</p><h3>7.2. Two roots at once</h3><p>A building materials firm is considering a short-term fill-sand quarry (illustrative figures). In year 0 it spends $4,000 on a permit, an access road and equipment; in year 1 it extracts and sells sand for a net $12,000; in year 2 it must spend $8,800 to restore the land and close the site. The cash flow &#8722;4,000, +12,000, &#8722;8,800 changes sign twice. Setting x = 1 + i, the equation &#8722;4,000x&#178; + 12,000x &#8722; 8,800 = 0 gives x = 1.2764 and x = 1.7236, that is, two roots of 27.64% and 72.36%. Figure 5 plots the NPV profile.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!TjP-!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!TjP-!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png 424w, https://substackcdn.com/image/fetch/$s_!TjP-!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png 848w, https://substackcdn.com/image/fetch/$s_!TjP-!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png 1272w, https://substackcdn.com/image/fetch/$s_!TjP-!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!TjP-!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png" width="1790" height="1009" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1009,&quot;width&quot;:1790,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:96929,&quot;alt&quot;:&quot;Line chart of an arch-shaped NPV profile against the discount rate from 0 to 100 percent: it starts at minus 800 dollars at 0 percent, passes minus 364 dollars at the 10 percent MARR, crosses zero at 27.64 percent, peaks just under 100 dollars and crosses zero again at 72.36 percent&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Line chart of an arch-shaped NPV profile against the discount rate from 0 to 100 percent: it starts at minus 800 dollars at 0 percent, passes minus 364 dollars at the 10 percent MARR, crosses zero at 27.64 percent, peaks just under 100 dollars and crosses zero again at 72.36 percent" title="Line chart of an arch-shaped NPV profile against the discount rate from 0 to 100 percent: it starts at minus 800 dollars at 0 percent, passes minus 364 dollars at the 10 percent MARR, crosses zero at 27.64 percent, peaks just under 100 dollars and crosses zero again at 72.36 percent" srcset="https://substackcdn.com/image/fetch/$s_!TjP-!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png 424w, https://substackcdn.com/image/fetch/$s_!TjP-!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png 848w, https://substackcdn.com/image/fetch/$s_!TjP-!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png 1272w, https://substackcdn.com/image/fetch/$s_!TjP-!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F43e26cf2-44f7-4c26-94da-56f2779d4990_1790x1009.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 5. A cash flow that changes sign twice has two IRRs, while NPV at the 10% MARR is still negative (illustrative figures).</figcaption></figure></div><p>Figure 5 exposes the trap: both roots exceed the 10% MARR, yet NPV at 10% is &#8722;4,000 + 12,000/1.1 &#8722; 8,800/1.21 = &#8722;$364, so the project should be rejected. The profile is an arch, positive only between the two roots. Neither "the project earns 27.64%" nor "it earns 72.36%" is meaningful, because the unrecovered balance changes sign during the project's life: the project switches from "the firm lends to the project" to "the project lends to the firm", and no single rate describes both roles. The cumulative cash flow &#8722;4,000, 8,000, &#8722;800 also changes sign twice, so the Norstrom criterion cannot guarantee a unique root. A spreadsheet's IRR function returns just one root depending on the guess: =IRR(B2:B4, 0.2) gives 27.64% and =IRR(B2:B4, 0.8) gives 72.36%. Anyone who does not count sign changes will never know the other root exists.</p><h3>7.3. The modified IRR</h3><p>The safest response is to return to NPV at the MARR, which always gives one number and one conclusion. If a percentage is required, the <strong>modified internal rate of return</strong> (MIRR) is an option. It brings all outflows back to year 0 at a finance rate, carries all inflows forward to the final year at a reinvestment rate and finds the growth rate that connects the two: MIRR = (future value of inflows / present value of outflows)^(1/n) &#8722; 1 (Park, 2019).</p><p>For the quarry, with a finance rate of 10% and a reinvestment rate of 12%, the present value of outflows is 4,000 + 8,800/1.10&#178; = $11,273, the future value of the inflow is 12,000 &#215; 1.12 = $13,440 and MIRR = (13,440 / 11,273)^(1/2) &#8722; 1 = 9.19%. This single figure is below the 10% MARR, so the project is rejected, in line with the negative NPV. In a spreadsheet, =MIRR(B2:B4, 10%, 12%) gives the same result (Microsoft, n.d.-b). The MIRR always has a unique value but is no longer "internal": it depends on two rates supplied from outside, so they must always be reported with it.</p><h3>7.4. The reinvestment assumption, read correctly</h3><p>Many textbooks list a weakness of IRR: it implicitly assumes that cash received is reinvested at the IRR itself. The IRR calculation by itself does not require the cash returned to be reinvested anywhere. As the unrecovered balance in Section 4 shows, 17.19% measures only the rate earned on capital still inside the router; cash already returned has left the project. The reinvestment assumption appears only when the IRR is read as the growth rate of the whole initial $20,000 up to year 6, that is, when someone says "$20,000 today will become 20,000 &#215; 1.1719^6 &#8776; $51,807 in year 6". That statement is true only if every $5,600 received along the way is reinvested at 17.19%.</p><p>If the workshop can reinvest only at its 10% MARR, the six receipts accumulate to about $43,207 by year 6, corresponding to a MIRR (with both rates at 10%) of 13.70%, about 3.5 points below the IRR. The gap grows as the IRR rises. NPV does not face this interpretation problem, because discounting at the MARR values every dollar at the opportunity cost the firm actually has. In practice, an IRR far above the MARR should be read as a large safety margin, not as "all my capital will grow at the IRR every year for the whole life". An investment proposal should report NPV and a MIRR at a realistic reinvestment rate alongside the IRR, so that an attractive IRR is not overstated.</p><h2>8. Irregular dates and a checklist for any headline rate</h2><p>Both traps end in the same place: a column of cash flows and a function that solves for the rate. This section adds the case of cash flows on irregular dates and gathers the errors from the whole article into one checklist.</p><h3>8.1. XIRR for real dates</h3><p>The IRR function treats every amount as exactly one period apart, while many real cash flows have specific dates: profit distributions after each settlement, collections of receivables, staged disbursements. The function XIRR(values, dates, [guess]) finds the annual rate r at which the sum of all amounts, each discounted by (1 + r)^(days since the first amount / 365), equals zero (Microsoft, n.d.-c). The result is already an effective annual rate, the same yardstick as an EU-style APRC. XNPV(rate, values, dates) is the matching NPV function.</p><p>Suppose a sole trader invests $12,000 on 15 January 2026 in a joint distribution agreement with a building materials dealer and receives profit shares on irregular settlement dates (illustrative figures). Table 8 lays out the cash flow as it would appear in a spreadsheet, with the results of both functions.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/L8aAH/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/3e6131a6-cba6-457d-88f6-b8e4b2bce125_1220x1182.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/04ba93cd-c61e-4b21-bc26-efe791dca651_1220x1302.png&quot;,&quot;height&quot;:547,&quot;title&quot;:&quot;Table 8. Cash flow of a distribution agreement on actual dates and the XIRR result (illustrative figures)&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/L8aAH/1/" width="730" height="547" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>According to Table 8, the agreement earns about 18.36% a year. Using IRR by mistake makes the spreadsheet treat the five amounts as one period apart, as if the agreement lasted four years instead of about seventeen months, and it returns 5.86%, a meaningless number. With a MARR of 10%, =XNPV(10%, C2:C6, A2:A6) gives about $824, positive, consistent with an XIRR above the MARR. The first amount in the range should be the earliest date, and the 365-day convention ignores leap years, an error too small to matter here.</p><h3>8.2. One checklist for both traps</h3><p>Table 9 gathers the errors met in this article, on the borrowing side and on the investment side, with the way to avoid each.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/EaJB7/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/f1001143-3817-4c95-b996-c054f1a44766_1220x1990.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/32f7fc9a-3b0c-48e1-b98e-188105b5df6e_1220x2110.png&quot;,&quot;height&quot;:928,&quot;title&quot;:&quot;Table 9. Common errors with headline rates and how to avoid them&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/EaJB7/1/" width="730" height="928" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Most errors in Table 9 share one root: treating a rate as if it were a measure of cost or value in itself, when it is only a summary of a cash flow. When asking an AI assistant to do these calculations, state the requirements explicitly: build the full cash flow with fees, solve for the effective rate rather than repeating the quoted one, perform incremental analysis against the current best, count sign changes before reporting a root and check every conclusion against NPV at the MARR, because assistants, like people, tend to favor the highest or lowest percentage on the page.</p><h2>Conclusion</h2><p>A nominal rate is the number that is quoted, a linear product of the rate per period and the number of periods; the effective rate, (1 + r/m)^m &#8722; 1, is the actual growth of money over a full year. The effective rate is never lower than the loan's own nominal rate, rises with compounding frequency and never exceeds the continuous limit e^r &#8722; 1. When payments and compounding follow different schedules, the rate must be converted to the payment period. Any comparison of loan or deposit offers is meaningful only on effective rates for the same period, and an effective rate is still not a real rate, since inflation is a separate adjustment.</p><p>In consumer credit and equipment financing, the largest gap comes from flat rates charged on the original balance. Recomputed exactly, the effective monthly rate of a flat-rate loan with a term of 6 to 60 months is about 1.5 to 1.85 times the flat monthly rate, peaking at medium terms and falling as the term lengthens rather than approaching two; on an annual basis it is usually 1.8 to 2.1 times the quoted figure. Upfront fees, insurance added to principal or a forgone cash discount can add close to ten more points. Disclosure rules help, but a US APR is a nominal rate and an EU APRC an effective one, so even disclosed rates need to be read with care.</p><p>The internal rate of return is the same kind of number seen from the investor's side: the rate at which a project's NPV is zero, the rate earned on capital still inside the project. For a single conventional project, "accept if the IRR is at least the MARR" agrees with NPV. That agreement does not extend to ranking. Because the IRR is a ratio, it ignores scale and favors early receipts, which is how a kiosk earning 28.65% loses to a caf&#233; earning 17.57% in value created. Incremental analysis, always against the current best, restores the right choice, and the incremental IRR is exactly the Fisher intersection of the two NPV profiles. When a cash flow changes sign more than once, count the sign changes, check the cumulative cash flow and return to NPV or a MIRR with both rates stated; when dates are irregular, use XIRR.</p><p>Both traps yield to one habit. Write every dollar received and paid in one column, solve for the rate with RATE, IRR or XIRR, then use the percentage to communicate and to sense the margin of safety, but let value, measured by NPV at a stated MARR, make the decision.</p><h2>References</h2><p>Blank, L. T., &amp; Tarquin, A. (2024). <em>Engineering economy</em> (9th ed.). McGraw Hill. <a href="https://www.mheducation.com/highered/product/engineering-economy-blank-tarquin/M9781264158096.html">https://www.mheducation.com/highered/product/engineering-economy-blank-tarquin/M9781264158096.html</a></p><p>Consumer Financial Protection Bureau. (n.d.-a). <em>Appendix J to Part 1026: Annual percentage rate computations for closed-end credit transactions</em> (Regulation Z). <a href="https://www.consumerfinance.gov/rules-policy/regulations/1026/j/">https://www.consumerfinance.gov/rules-policy/regulations/1026/j/</a></p><p>Consumer Financial Protection Bureau. (n.d.-b). <em>&#167; 1026.24 Advertising</em> (Regulation Z). <a href="https://www.consumerfinance.gov/rules-policy/regulations/1026/24/">https://www.consumerfinance.gov/rules-policy/regulations/1026/24/</a></p><p>European Parliament and Council of the European Union. (2008). <em>Directive 2008/48/EC of 23 April 2008 on credit agreements for consumers and repealing Council Directive 87/102/EEC</em>. Official Journal of the European Union, L 133, 66&#8211;92. <a href="https://eur-lex.europa.eu/eli/dir/2008/48/oj">https://eur-lex.europa.eu/eli/dir/2008/48/oj</a></p><p>European Parliament and Council of the European Union. (2023). <em>Directive (EU) 2023/2225 of 18 October 2023 on credit agreements for consumers and repealing Directive 2008/48/EC</em>. Official Journal of the European Union. <a href="https://eur-lex.europa.eu/eli/dir/2023/2225/oj">https://eur-lex.europa.eu/eli/dir/2023/2225/oj</a></p><p>Graham, J. R., &amp; Harvey, C. R. (2001). The theory and practice of corporate finance: Evidence from the field. <em>Journal of Financial Economics, 60</em>(2&#8211;3), 187&#8211;243. <a href="https://doi.org/10.1016/S0304-405X(01">https://doi.org/10.1016/S0304-405X(01)00044-7</a>00044-7)</p><p>Microsoft. (n.d.-a). <em>IRR function</em>. Microsoft Support. <a href="https://support.microsoft.com/en-us/office/irr-function-64925eaa-9988-495b-b290-3ad0c163c1bc">https://support.microsoft.com/en-us/office/irr-function-64925eaa-9988-495b-b290-3ad0c163c1bc</a></p><p>Microsoft. (n.d.-b). <em>MIRR function</em>. Microsoft Support. <a href="https://support.microsoft.com/en-us/office/mirr-function-b020f038-7492-4fb4-93c1-35c345b53524">https://support.microsoft.com/en-us/office/mirr-function-b020f038-7492-4fb4-93c1-35c345b53524</a></p><p>Microsoft. (n.d.-c). <em>XIRR function</em>. Microsoft Support. <a href="https://support.microsoft.com/en-us/office/xirr-function-de1242ec-6477-445b-b11b-a303ad9adc9d">https://support.microsoft.com/en-us/office/xirr-function-de1242ec-6477-445b-b11b-a303ad9adc9d</a></p><p>Newnan, D. G., Eschenbach, T. G., Lavelle, J. P., &amp; Lewis, N. A. (2020). <em>Engineering economic analysis</em> (14th ed.). Oxford University Press. <a href="https://global.oup.com/ushe/product/engineering-economic-analysis-9780190931919">https://global.oup.com/ushe/product/engineering-economic-analysis-9780190931919</a></p><p>Norstrom, C. J. (1972). A sufficient condition for a unique nonnegative internal rate of return. <em>Journal of Financial and Quantitative Analysis, 7</em>(3), 1835&#8211;1839. <a href="https://doi.org/10.2307/2329806">https://doi.org/10.2307/2329806</a></p><p>Park, C. S. (2019). <em>Fundamentals of engineering economics</em> (4th ed., Global ed.). Pearson. <a href="https://www.pearson.com/en-gb/subject-catalog/p/fundamentals-of-engineering-economics-global-edition/P200000005189">https://www.pearson.com/en-gb/subject-catalog/p/fundamentals-of-engineering-economics-global-edition/P200000005189</a></p><p>Stango, V., &amp; Zinman, J. (2009). Exponential growth bias and household finance. <em>The Journal of Finance, 64</em>(6), 2807&#8211;2849. <a href="https://doi.org/10.1111/j.1540-6261.2009.01518.x">https://doi.org/10.1111/j.1540-6261.2009.01518.x</a></p><p>Sullivan, W. G., Wicks, E. M., &amp; Koelling, C. P. (2019). <em>Engineering economy</em> (17th ed., Global ed.). Pearson. <a href="https://www.pearson.com/en-gb/subject-catalog/p/engineering-economy-global-edition/P200000005519/9781292264905">https://www.pearson.com/en-gb/subject-catalog/p/engineering-economy-global-edition/P200000005519/9781292264905</a></p>]]></content:encoded></item><item><title><![CDATA[Sunk Cost and Opportunity Cost: Deciding Better]]></title><description><![CDATA[Two ideas that change how you decide: count the best option you give up, and ignore the money that is already gone]]></description><link>https://www.phuonglib.com/p/sunk-cost-and-opportunity-cost</link><guid isPermaLink="false">https://www.phuonglib.com/p/sunk-cost-and-opportunity-cost</guid><dc:creator><![CDATA[PHUONGLIB]]></dc:creator><pubDate>Fri, 27 Nov 2026 18:15:43 GMT</pubDate><enclosure url="https://substack-post-media.s3.amazonaws.com/public/images/0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp" length="0" type="image/jpeg"/><content:encoded><![CDATA[<div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!t6-R!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!t6-R!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp 424w, https://substackcdn.com/image/fetch/$s_!t6-R!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp 848w, https://substackcdn.com/image/fetch/$s_!t6-R!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp 1272w, https://substackcdn.com/image/fetch/$s_!t6-R!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp 1456w" sizes="100vw"><img src="https://substackcdn.com/image/fetch/$s_!t6-R!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp" width="2560" height="1440" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1440,&quot;width&quot;:2560,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:973886,&quot;alt&quot;:&quot;A forked forest path, footprints going left, while on the untaken right branch a basket of orange fruit sits alone.&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/webp&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:false,&quot;topImage&quot;:true,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="A forked forest path, footprints going left, while on the untaken right branch a basket of orange fruit sits alone." title="A forked forest path, footprints going left, while on the untaken right branch a basket of orange fruit sits alone." srcset="https://substackcdn.com/image/fetch/$s_!t6-R!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp 424w, https://substackcdn.com/image/fetch/$s_!t6-R!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp 848w, https://substackcdn.com/image/fetch/$s_!t6-R!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp 1272w, https://substackcdn.com/image/fetch/$s_!t6-R!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F0c061418-0897-47d8-8d1e-5af230ad82ab_2560x1440.webp 1456w" sizes="100vw" fetchpriority="high"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a></figure></div><blockquote><p><strong>Key takeaways</strong></p><ul><li><p>Opportunity cost is the value of the best alternative you give up. Using your own premises or time is never free: economic profit subtracts these implicit costs, accounting profit does not.</p></li><li><p>The opportunity cost of capital underlies the minimum attractive rate of return (MARR) and the discount rate, as long as you compare with an alternative of similar risk.</p></li><li><p>A sunk cost is money already spent that cannot be recovered. Only relevant costs, future cash flows that differ between options, belong in a decision.</p></li><li><p>Loss aversion, the wish to be consistent and ego keep people trapped in sunk costs; in organizations this becomes escalation of commitment.</p></li><li><p>The two ideas work as a pair: look forward at what you will miss, and ignore what you cannot get back.</p></li></ul></blockquote><div><hr></div><p>Two of the most useful ideas in economics are also two of the most often misused. One concerns what you give up when you choose; the other concerns what you have already spent. Together they explain why a business plan that "pays for itself" can make you poorer, why a student's master's degree costs far more than its tuition, and why teams keep pouring money into projects they should have stopped long ago.</p><p>The first idea is <strong>opportunity cost</strong>: the value of the best alternative forgone when you make a choice. Mankiw (2021) lists it among the foundational principles of economics, because every decision is made with limited resources. The second is <strong>sunk cost</strong>: a cost already incurred that cannot be recovered whatever you do next. Economics says it should play no part in future decisions; human psychology makes sure it often does.</p><p>This article treats the two ideas as a pair. Section 1 introduces opportunity cost through a simple story about two barrels of apples. Section 2 defines opportunity cost and separates accounting profit from economic profit, with a worked restaurant example. Section 3 explains the opportunity cost of capital and the MARR, and Section 4 calculates the true cost of a master's degree. Section 5 turns to sunk costs and how to tell what is sunk from what is not. Section 6 explains the psychology of the sunk cost trap and escalation of commitment, and Section 7 looks at examples from business, investing and everyday life. Section 8 proposes five ways out of the trap and explains when continuing is the right call. Section 9 lists common mistakes, and Section 10 applies both ideas to a classroom attendance policy.</p><h2>1. A story of two barrels of apples</h2><p>You have two barrels of apples: one fresh, one with a few apples starting to rot. Which should you eat first? The question sounds trivial, but it holds one of the most important ideas in economics. Whichever way you choose, you are giving something up, and what you give up is usually invisible; it appears on no receipt.</p><p>If you eat the bad apples first, you cut away the rotten parts and eat the rest, so nothing is wasted. But by the time you finish the bad barrel, the good one has started to go soft, and the cycle continues: you almost never eat an apple at its best. If you eat the good apples first, you always enjoy good apples, but some of the others may have to be thrown away. Table 1 summarizes what each approach gains and gives up.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/n3MX0/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/14aff229-e3d1-4a30-8d6d-a741995a077a_1220x392.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/29f33dcc-c2b8-4f0a-9676-68b568743f0a_1220x462.png&quot;,&quot;height&quot;:223,&quot;title&quot;:&quot;Table 1. What you gain and give up when eating the apples.&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/n3MX0/1/" width="730" height="223" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>As Table 1 shows, there is no right answer for everyone; the choice depends on each person's values. What matters is to see what you are giving up, not only what you get. People who eat the bad apples first often think they are "saving", without noticing that they are paying another, less visible price.</p><h2>2. Opportunity cost and economic profit</h2><p>From the apple story we can move to a precise definition and tools for measurement. This section defines opportunity cost, distinguishes two kinds of cost and introduces two ways of calculating profit, then works through an example.</p><h3>2.1. Defining opportunity cost</h3><p>Opportunity cost is the value of the best alternative forgone when an option is chosen (Buchanan, 2008). The words "the best" matter: opportunity cost is not the sum of all the options you give up, only the most valuable of them, because you could not do them all at once.</p><p>Opportunity cost exists because resources are limited. The same sum of money, the same evening, the same premises cannot be used for two things at once. It can be measured in money, but also in time, experience, health or satisfaction, things that are hard to convert but no less real.</p><h3>2.2. Explicit and implicit costs</h3><p>When costing a project, you need to separate two kinds of cost: the money actually paid out, and the value of your own resources that you put to use. Table 2 distinguishes them using the example of opening a restaurant on the ground floor of your own house.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/KjSN0/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/4340c5d9-8063-4e4f-aa3f-8fae610ece92_1220x556.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/62fc10dd-bcdf-4e27-87b6-20053f46bf9d_1220x626.png&quot;,&quot;height&quot;:255,&quot;title&quot;:&quot;Table 2. Explicit and implicit costs.&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/KjSN0/1/" width="730" height="255" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Table 2 shows that implicit costs are the opportunity costs of resources you already own. The family's premises are not "free", because they could be rented out; the founder's time is not "free", because it could be spent earning a salary.</p><h3>2.3. Accounting profit and economic profit</h3><p>The two kinds of cost lead to two ways of calculating profit. Accounting profit equals revenue minus explicit costs; it is the figure in the books. Economic profit equals revenue minus explicit costs minus implicit costs; it tells you whether the project creates more value than the best alternative you gave up.</p><p>A project is only worth doing in economic terms when economic profit is greater than or equal to zero. Zero economic profit does not mean no profit; it means the project yields exactly as much as the best alternative, so you are no worse off by choosing it.</p><h3>2.4. A worked example: a restaurant at home</h3><p>The gap between the two profit measures is clearest when founders use their own assets and time. Suppose you earn USD 900 a month in a job and rent out the ground floor of your house for USD 600 a month. You plan to quit your job and take back the premises to open a restaurant. Table 3 shows the expected monthly results.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/RnJ73/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/2e07872f-b2e4-44df-82d1-c6f5f71ccb46_1220x652.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/4d9deef6-88f5-40bc-8780-35f3a726b6a7_1220x772.png&quot;,&quot;height&quot;:362,&quot;title&quot;:&quot;Table 3. Accounting profit and economic profit of the restaurant (illustrative figures).&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/RnJ73/1/" width="730" height="362" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Table 3 can be pictured as a chain of deductions, shown in Figure 1: from revenue, subtract explicit costs to get accounting profit, then subtract the two implicit costs.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!ErP_!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!ErP_!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png 424w, https://substackcdn.com/image/fetch/$s_!ErP_!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png 848w, https://substackcdn.com/image/fetch/$s_!ErP_!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png 1272w, https://substackcdn.com/image/fetch/$s_!ErP_!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!ErP_!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png" width="1675" height="923" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:923,&quot;width&quot;:1675,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:57913,&quot;alt&quot;:&quot;Waterfall chart: revenue USD 5,000, minus explicit costs USD 3,750 gives accounting profit USD 1,250, minus forgone rent USD 600 and forgone salary USD 900 leaves economic profit of &#8722;USD 250&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Waterfall chart: revenue USD 5,000, minus explicit costs USD 3,750 gives accounting profit USD 1,250, minus forgone rent USD 600 and forgone salary USD 900 leaves economic profit of &#8722;USD 250" title="Waterfall chart: revenue USD 5,000, minus explicit costs USD 3,750 gives accounting profit USD 1,250, minus forgone rent USD 600 and forgone salary USD 900 leaves economic profit of &#8722;USD 250" srcset="https://substackcdn.com/image/fetch/$s_!ErP_!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png 424w, https://substackcdn.com/image/fetch/$s_!ErP_!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png 848w, https://substackcdn.com/image/fetch/$s_!ErP_!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png 1272w, https://substackcdn.com/image/fetch/$s_!ErP_!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F601a65d1-8cc8-4548-974c-3155cc17fd22_1675x923.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 1. From accounting profit to economic profit for the restaurant (illustrative figures).</figcaption></figure></div><p>Figure 1 shows that the books report a profit of USD 1,250, but in economic terms you are USD 250 a month poorer than if you had kept things as they were. If your business plan records "premises cost: zero", it will make the project look too good.</p><p>This does not mean you should not open the restaurant. You may expect revenue to grow after a year, or value being your own boss more than the USD 250 difference. But you need to know the price you are paying. Economic profit should also be kept apart from cash flow: not paying rent eases the restaurant's monthly cash pressure, which is a cash-flow benefit, not an economic-profit one. The same principle applies to any startup plan: include the founders' salaries and the market rent of assets you already own as costs.</p><h2>3. The opportunity cost of capital and the MARR</h2><p>Opportunity cost applies not only to premises and time but to the investment money itself. This section explains the opportunity cost of capital, its role in engineering economics, and the requirement of comparable risk.</p><h3>3.1. From the opportunity cost of capital to the MARR</h3><p>Money invested in a project always has alternatives: a bank deposit, paying off debt, investing in another project. The return of the best alternative with comparable risk is the <strong>opportunity cost of capital</strong>. It is the basis on which firms set their <strong>MARR</strong> (minimum attractive rate of return) and the discount rate used to compute a project's net present value (NPV) (Park, 2019).</p><p>Two decision rules then become intuitive. If NPV at a discount rate equal to the MARR is positive, the project creates more value than the alternative. If the project's internal rate of return (IRR) is below the MARR, it does not cover the opportunity cost of capital, and the money should be used elsewhere.</p><h3>3.2. Risk must be comparable</h3><p>A common mistake is to compare the returns of two options with very different risks. You cannot simply say "the opportunity cost of a savings deposit is the return on stocks", because stocks are far riskier. The right comparison is with an alternative of comparable risk.</p><p>That is why different firms, and different projects within one firm, use different MARRs. A project extending a product with an established market can use a lower MARR; a completely new product, with higher risk, needs a higher MARR to compensate.</p><h2>4. A worked example: start working or study for a master's?</h2><p>Opportunity cost matters especially in education decisions, where people tend to see only the tuition. This section works through an example with illustrative figures, ignoring discounting for simplicity.</p><p>A new graduate has a job offer paying USD 4,000 a month, or could study full time for a two-year master's degree with tuition of USD 60,000. Table 4 calculates the total economic cost of the degree.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/yZeAw/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/92f3dac7-03fe-4e1e-b12f-2a64dbe703be_1220x430.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/d198b017-7f12-4866-b184-10578de5e3f3_1220x550.png&quot;,&quot;height&quot;:251,&quot;title&quot;:&quot;Table 4. The economic cost of a two-year master's degree (illustrative figures).&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/yZeAw/1/" width="730" height="251" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Figure 2 sets the two numbers side by side: the cost students usually see and the true economic cost.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!D4Dt!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!D4Dt!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png 424w, https://substackcdn.com/image/fetch/$s_!D4Dt!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png 848w, https://substackcdn.com/image/fetch/$s_!D4Dt!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png 1272w, https://substackcdn.com/image/fetch/$s_!D4Dt!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!D4Dt!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png" width="1638" height="807" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:807,&quot;width&quot;:1638,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:50513,&quot;alt&quot;:&quot;Horizontal bar chart: the cost students usually see is USD 60,000 in tuition; the true economic cost is USD 156,000 including USD 96,000 in forgone earnings&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Horizontal bar chart: the cost students usually see is USD 60,000 in tuition; the true economic cost is USD 156,000 including USD 96,000 in forgone earnings" title="Horizontal bar chart: the cost students usually see is USD 60,000 in tuition; the true economic cost is USD 156,000 including USD 96,000 in forgone earnings" srcset="https://substackcdn.com/image/fetch/$s_!D4Dt!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png 424w, https://substackcdn.com/image/fetch/$s_!D4Dt!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png 848w, https://substackcdn.com/image/fetch/$s_!D4Dt!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png 1272w, https://substackcdn.com/image/fetch/$s_!D4Dt!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F08ceae5d-5495-495e-9988-0b91a97fca21_1638x807.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 2. The visible cost and the economic cost of a master's degree (illustrative figures).</figcaption></figure></div><p>As Figure 2 shows, the real cost is more than two and a half times the tuition. If the degree raises the salary by USD 2,000 a month, it takes about 156,000 &#247; 2,000 = 78 months, more than six years, to break even, before discounting. The decision of course also depends on non-monetary value such as knowledge, networks and experience, and on whether the degree opens jobs that would otherwise be out of reach.</p><h2>5. Sunk costs: what is already gone</h2><p>Opportunity cost looks forward, at what you will miss. Its counterpart looks backward. You buy a cinema ticket, sit through 20 minutes and realize the film is terrible. Most of us think: "I've paid, I might as well watch the rest." So you spend 90 more unhappy minutes just so as not to "waste" the ticket, even though the money is gone whether you stay or leave. Staying recovers nothing; it only costs you 90 more minutes.</p><h3>5.1. Definition</h3><p>That ticket is a <strong>sunk cost</strong>: a cost already incurred that cannot be recovered whatever decision comes next (Park, 2019). Table 5 summarizes the two properties that define it.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/DJJxo/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/fd0b3822-bd3d-4f7e-bbb0-2fc63b7e7ff3_1220x388.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/4423336e-d081-4c69-bf00-1cccdf79c4c5_1220x458.png&quot;,&quot;height&quot;:205,&quot;title&quot;:&quot;Table 5. The two properties of a sunk cost.&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/DJJxo/1/" width="730" height="205" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Both properties must hold. A drug company that has spent USD 50 million researching a drug will not see that money again whether it continues or cancels the project, so it is a sunk cost. But a machine bought three years ago that can still be sold for part of its value is sunk only in the part that cannot be recovered.</p><h3>5.2. Sunk costs and relevant costs</h3><p>The opposite of a sunk cost is a <strong>relevant cost</strong>: a cost that lies in the future and differs between the options. Only relevant costs should be used in a decision. Figure 3 shows the boundary between the two: the moment of decision splits the past from the future.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!YOdM!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!YOdM!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png 424w, https://substackcdn.com/image/fetch/$s_!YOdM!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png 848w, https://substackcdn.com/image/fetch/$s_!YOdM!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png 1272w, https://substackcdn.com/image/fetch/$s_!YOdM!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!YOdM!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png" width="1920" height="768" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:768,&quot;width&quot;:1920,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:95056,&quot;alt&quot;:&quot;Two zones divided by a red \&quot;today\&quot; line: on the left the past, with sunk costs such as a ticket already paid for, a machine's purchase price and research already done; on the right the future, with salvage value, cancellation penalties and cash flows from now on&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="Two zones divided by a red &quot;today&quot; line: on the left the past, with sunk costs such as a ticket already paid for, a machine's purchase price and research already done; on the right the future, with salvage value, cancellation penalties and cash flows from now on" title="Two zones divided by a red &quot;today&quot; line: on the left the past, with sunk costs such as a ticket already paid for, a machine's purchase price and research already done; on the right the future, with salvage value, cancellation penalties and cash flows from now on" srcset="https://substackcdn.com/image/fetch/$s_!YOdM!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png 424w, https://substackcdn.com/image/fetch/$s_!YOdM!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png 848w, https://substackcdn.com/image/fetch/$s_!YOdM!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png 1272w, https://substackcdn.com/image/fetch/$s_!YOdM!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F6e9bc014-3b75-4f0a-9fd1-0da930f5d232_1920x768.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 3. Sunk costs belong to the past; relevant costs belong to the future.</figcaption></figure></div><p>As Figure 3 shows, the only question to ask when deciding is: from today on, what cash comes in and goes out under each option? Everything to the left of the "today" line has already happened in the same way for every option, so it cannot help you tell which option is better.</p><h3>5.3. What is sunk and what is not</h3><p>In practice, the line between sunk and relevant costs is not always clear, and it is a frequent source of errors in engineering economics exercises. Some items look as if they belong to the past but actually create future cash flows, and vice versa. Table 6 classifies five items that often cause confusion.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/rKj3q/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/7af28848-e601-4695-b44c-beb4b0658d20_1220x802.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/a6f9dded-ad22-4df1-99e3-174764d46d9f_1220x922.png&quot;,&quot;height&quot;:413,&quot;title&quot;:&quot;Table 6. Classifying items when deciding whether to stop or continue.&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/rKj3q/1/" width="730" height="413" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Table 6 shows that the two items most often missed are salvage value and the penalty for stopping. Both are future cash flows that occur only under a specific option, so they must be included in the comparison.</p><h3>5.4. Example: should you replace an old machine?</h3><p>Equipment replacement is the classic way to see how sunk costs are kept out of the analysis. Suppose a workshop bought machine A three years ago for USD 50,000. A new machine B costs USD 40,000 and saves USD 12,000 a year in operating costs compared with A. Machine A can be sold for USD 10,000. Both machines can be used for four more years; for simplicity, ignore discounting and tax. Table 7 compares the future cash flows of the two options.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/s81uR/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/ee5cb5e4-3f03-4273-b2be-b1d763aee723_1220x610.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/ae50cad9-7aa7-4e8c-9782-88a3e163d714_1220x730.png&quot;,&quot;height&quot;:341,&quot;title&quot;:&quot;Table 7. Future cash flows of keeping or replacing the machine (illustrative figures).&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/s81uR/1/" width="730" height="341" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Table 7 shows that the machine should be replaced, even though machine A is "only three years old and cost USD 50,000". The regret over USD 50,000 is real, but it changes no number in either column. In a real analysis you would discount the cash flows at the MARR and account for tax, following the principles in Section 3.</p><h2>6. The sunk cost trap</h2><p>If the principle is so simple, why do people still fall into the trap? This section presents the experimental evidence for the sunk cost trap, the three psychological mechanisms behind it, and its organizational version, escalation of commitment.</p><h3>6.1. Evidence from experiments</h3><p>The <strong>sunk cost fallacy</strong> is the tendency to continue something because you have invested a lot in it, even though current information says stopping would be better. Arkes and Blumer (1985) demonstrated it in a well-known experiment: people randomly assigned to buy season theatre tickets at full price attended more performances than those given a discount, even though the plays were the same. Having paid more made people feel they had to "get their money's worth", although going to more plays recovered nothing.</p><h3>6.2. Three psychological mechanisms</h3><p>The sunk cost trap is not caused by ignorance but by very common psychological mechanisms. Table 8 presents the three main ones.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/r0fzF/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/08bf666f-619a-4d9b-815e-6b313a368376_1220x590.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/ea66a8a1-9722-4bf9-a7cd-8b92e1880f9e_1220x710.png&quot;,&quot;height&quot;:290,&quot;title&quot;:&quot;Table 8. Three psychological mechanisms behind the sunk cost trap.&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/r0fzF/1/" width="730" height="290" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>The three mechanisms in Table 8 usually act together. For a founder, stopping a project means accepting the loss, admitting to family and investors that the original decision was wrong, and facing a sense of personal failure. No wonder continuing often feels better emotionally, even though it costs more economically.</p><h3>6.3. Escalation of commitment</h3><p>In organizations, the sunk cost trap has a stronger version called <strong>escalation of commitment</strong>. Staw (1976) showed that people personally responsible for a failing decision tend to invest more in that same decision than people who are not responsible. Figure 4 shows the loop that produces this.</p><div class="captioned-image-container"><figure><a class="image-link image2 is-viewable-img" target="_blank" href="https://substackcdn.com/image/fetch/$s_!mGvT!,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png" data-component-name="Image2ToDOM"><div class="image2-inset"><picture><source type="image/webp" srcset="https://substackcdn.com/image/fetch/$s_!mGvT!,w_424,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png 424w, https://substackcdn.com/image/fetch/$s_!mGvT!,w_848,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png 848w, https://substackcdn.com/image/fetch/$s_!mGvT!,w_1272,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png 1272w, https://substackcdn.com/image/fetch/$s_!mGvT!,w_1456,c_limit,f_webp,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png 1456w" sizes="auto, 100vw"><img src="https://substackcdn.com/image/fetch/$s_!mGvT!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png" width="1356" height="1280" data-attrs="{&quot;src&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png&quot;,&quot;srcNoWatermark&quot;:null,&quot;fullscreen&quot;:null,&quot;imageSize&quot;:null,&quot;height&quot;:1280,&quot;width&quot;:1356,&quot;resizeWidth&quot;:null,&quot;bytes&quot;:105771,&quot;alt&quot;:&quot;A four-step loop: initial investment, bad results, self-justification, invest more, then back again&quot;,&quot;title&quot;:null,&quot;type&quot;:&quot;image/png&quot;,&quot;href&quot;:null,&quot;belowTheFold&quot;:true,&quot;topImage&quot;:false,&quot;internalRedirect&quot;:null,&quot;isProcessing&quot;:false,&quot;align&quot;:null,&quot;offset&quot;:false}" class="sizing-normal" alt="A four-step loop: initial investment, bad results, self-justification, invest more, then back again" title="A four-step loop: initial investment, bad results, self-justification, invest more, then back again" srcset="https://substackcdn.com/image/fetch/$s_!mGvT!,w_424,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png 424w, https://substackcdn.com/image/fetch/$s_!mGvT!,w_848,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png 848w, https://substackcdn.com/image/fetch/$s_!mGvT!,w_1272,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png 1272w, https://substackcdn.com/image/fetch/$s_!mGvT!,w_1456,c_limit,f_auto,q_auto:good,fl_progressive:steep/https%3A%2F%2Fsubstack-post-media.s3.amazonaws.com%2Fpublic%2Fimages%2F9391a10a-04cd-4f47-b0f2-eac0fda60557_1356x1280.png 1456w" sizes="auto, 100vw" loading="lazy"></picture><div class="image-link-expand"><div class="pencraft pc-display-flex pc-gap-8 pc-reset"><button class="pencraft pc-reset pencraft icon-container restack-image buttonBase-tqxFUX" tabindex="0" type="button"><svg aria-hidden="true" width="20" height="20" viewBox="0 0 20 20" fill="none" stroke-width="1.5" stroke="var(--color-fg-primary)" stroke-linecap="round" stroke-linejoin="round" xmlns="http://www.w3.org/2000/svg" class="icon-noB79L"><g><path d="M2.53001 7.81595C3.49179 4.73911 6.43281 2.5 9.91173 2.5C13.1684 2.5 15.9537 4.46214 17.0852 7.23684L17.6179 8.67647M17.6179 8.67647L18.5002 4.26471M17.6179 8.67647L13.6473 6.91176M17.4995 12.1841C16.5378 15.2609 13.5967 17.5 10.1178 17.5C6.86118 17.5 4.07589 15.5379 2.94432 12.7632L2.41165 11.3235M2.41165 11.3235L1.5293 15.7353M2.41165 11.3235L6.38224 13.0882"></path></g></svg></button><button class="pencraft pc-reset pencraft icon-container view-image buttonBase-tqxFUX" tabindex="0" type="button"><svg xmlns="http://www.w3.org/2000/svg" width="20" height="20" viewBox="0 0 24 24" fill="none" stroke="currentColor" stroke-width="2" stroke-linecap="round" stroke-linejoin="round" class="lucide lucide-maximize2 lucide-maximize-2 icon-noB79L"><polyline points="15 3 21 3 21 9"></polyline><polyline points="9 21 3 21 3 15"></polyline><line x1="21" x2="14" y1="3" y2="10"></line><line x1="3" x2="10" y1="21" y2="14"></line></svg></button></div></div></div></a><figcaption class="image-caption">Figure 4. The escalation of commitment loop.</figcaption></figure></div><p>Figure 4 shows why escalation is hard to stop: each additional investment makes the sum already spent larger, which makes admitting the mistake more painful, which drives further investment. The loop is broken only by something from outside, such as a new decision-maker or a stopping rule set in advance, as Section 8 discusses.</p><h2>7. Examples from business, investing and everyday life</h2><p>The sunk cost trap appears at every scale, from a software project or a national project to personal portfolios and everyday choices. This section looks at four groups of examples.</p><h3>7.1. An almost finished software project</h3><p>Suppose a company has spent USD 1 million on a software project. Near completion, the market changes and a competitor already has a better solution. It would take another USD 500,000 to finish; expected revenue, after reassessment, is only USD 200,000. Table 9 compares the two options using only future cash flows.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/dpBhe/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/867a400f-1e24-4ab6-97e2-9d7b41c77ba6_1220x398.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/3af9dde1-8e06-4b1f-b817-ba67d932ac98_1220x518.png&quot;,&quot;height&quot;:225,&quot;title&quot;:&quot;Table 9. Continue or stop the software project (illustrative figures).&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/dpBhe/1/" width="730" height="225" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>Table 9 shows that the USD 1 million already spent appears in neither column. Stopping avoids losing another USD 300,000. The argument "we've already spent a million, just half a million more and it's done" sounds reasonable but rests entirely on a sunk cost.</p><h3>7.2. Concorde</h3><p>Concorde, the supersonic airliner developed jointly by Britain and France, kept being funded despite poor commercial prospects. The phenomenon is sometimes called the "Concorde effect" (Arkes &amp; Ayton, 1999). There is a nuance, though: the treaty between the two countries made unilateral withdrawal very costly, so part of the reason to continue was a future cost of withdrawing, not purely a sunk cost. The example is a reminder to check for future costs of the "stop" option before concluding that someone has fallen into the trap.</p><h3>7.3. Holding on to losing stocks</h3><p>An investor buys a stock at USD 100; its price falls to USD 40 on poor business results, but the investor holds on, waiting to "get back to even". The USD 100 purchase price is a sunk cost; the right question is: at USD 40 today, would I buy this stock? If the answer is no, continuing to hold it amounts to deciding to buy it again at today's price. Shefrin and Statman (1985) called the tendency to sell winning stocks too early and hold losing stocks too long the <strong>disposition effect</strong>.</p><h3>7.4. Students and startup teams</h3><p>The sunk cost trap shows up in many everyday decisions: overeating at a buffet to "get your money's worth", finishing a bad book because you are halfway through, staying in an unhappy relationship because you have "invested" years in it. For students, a familiar example is continuing in a major that is clearly a poor fit "because I've already done two years".</p><p>For startup teams, the most common form is sticking with the original idea even when customer interviews show nobody needs it, which is the "failure to pivot" reason in studies of startup failure. The months spent building the product are sunk; the only valuable thing they leave behind is the information gained, and that information may be saying it is time to pivot.</p><h2>8. Five ways out of the trap, and when to keep going</h2><p>Knowing about the sunk cost trap is not enough to avoid it, because the mechanisms in Section 6 keep working. This section proposes five concrete ways out, from reframing the question to designing the decision process, then clarifies when persisting is the right choice.</p><h3>8.1. Five ways out</h3><p>The first is to reframe the question: if today were day one, with the information I have now, would I start this project? The question puts the decision-maker back at the "today" line in Figure 3, where money already spent plays no role.</p><p>The second is to think in terms of opportunity cost: what could the extra money and time put into this project create elsewhere? Sunk costs make people look backward; opportunity costs force them to look forward.</p><p>The third is to ask an outsider. Someone without an emotional attachment to the money already spent will see more objectively. In organizations, the decision to stop or continue can be given to someone other than the project's originator, the most direct way to cut the loop in Figure 4.</p><p>The fourth is to separate the person from the decision. Admitting that an old decision was wrong does not mean you have failed; the decision may have been right given the information at the time. Continuing when you know it is wrong is the real failure.</p><p>The fifth is to set stopping points in advance. Before starting, write down criteria for time, budget and results, for example: "after 8 weeks, if fewer than 20 customers have paid, we stop or pivot". When the milestone arrives, the decision follows criteria agreed while everyone was clear-headed, and is less driven by emotion.</p><h3>8.2. When is continuing the right decision?</h3><p>Understanding the sunk cost trap does not mean every project in difficulty should be stopped. Continuing is right when the future benefits of continuing exceed the future costs, regardless of how much has been spent. A project that has cost a great deal should still be finished if the remaining spending is small and the remaining benefit large. The difference between persistence and the trap lies not in the decision to continue or stop but in the reason: persistence rests on future cash flows and new evidence; the trap rests on money already spent and the wish not to admit a loss.</p><p>For startup teams, a useful test is: what evidence from the past month makes us believe more in this project? If the only answer is "we've built a lot", that is the sunk cost talking. If the answer is "three customers have paid and our retention rate is rising", that is evidence to continue.</p><h2>9. Common mistakes with opportunity cost</h2><p>Opportunity cost sounds simple but is easy to misuse. Table 10 summarizes the three most common mistakes, with examples and the right approach.</p><div id="datawrapper-iframe" class="datawrapper-wrap outer" data-attrs="{&quot;url&quot;:&quot;https://datawrapper.dwcdn.net/kjwnF/1/&quot;,&quot;thumbnail_url&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/989c99ab-6218-4bb8-8a4a-6365de37b5c4_1220x590.png&quot;,&quot;thumbnail_url_full&quot;:&quot;https://substack-post-media.s3.amazonaws.com/public/images/5517b080-9bd0-4cc4-92e6-5dc2e30cd540_1220x660.png&quot;,&quot;height&quot;:323,&quot;title&quot;:&quot;Table 10. Three common mistakes with opportunity cost.&quot;,&quot;description&quot;:&quot;&quot;,&quot;belowTheFold&quot;:true}" data-component-name="DatawrapperToDOM"><iframe id="iframe-datawrapper" class="datawrapper-iframe" src="https://datawrapper.dwcdn.net/kjwnF/1/" width="730" height="323" frameborder="0" scrolling="no" loading="lazy"></iframe><script type="text/javascript">!function(){"use strict";window.addEventListener("message",(function(e){if(void 0!==e.data["datawrapper-height"]){var t=document.querySelectorAll("iframe");for(var a in e.data["datawrapper-height"])for(var r=0;r<t.length;r++){if(t[r].contentWindow===e.source)t[r].style.height=e.data["datawrapper-height"][a]+"px"}}}))}();</script></div><p>The third mistake is more common than you might think. Frederick et al. (2009) found that consumers often do not think of alternatives when deciding to buy; but simply being reminded, with a phrase such as "keep this money for other purchases", noticeably reduced the share who chose to buy. In other words, the habit of asking "what else could this money do?" on its own changes decisions.</p><p>The two ideas of this article also guard against each other's misuse. Opportunity cost looks to the future, at what you will miss; sunk cost belongs to the past, at what is gone for good. Good decisions count opportunity costs and ignore sunk costs.</p><h2>10. A classroom application: absences and opportunity cost</h2><p>Opportunity cost is also the basis of the attendance policy in the author's courses. This section explains how two kinds of absence are distinguished and handled.</p><h3>10.1. Voluntary absence</h3><p>A voluntary absence is when a student chooses to miss class to do something else: a job interview, an internship, part-time work, an event, a trip home or a holiday. The opportunity cost of that choice is the full value of the missed class: direct instruction, interaction, attendance marks and information shared in class.</p><p>Asking for attendance to be restored, a test to be retaken or materials to be provided individually after a voluntary absence is therefore asking for the benefit of option A without paying the price of giving up B. That is neither economically sound nor fair to classmates who accepted the opportunity cost of coming to class. Students take responsibility for their choices: if the interview was worth it, it must be worth losing the attendance mark and catching up on their own.</p><h3>10.2. Involuntary absence</h3><p>An involuntary absence is when a student or their family faces an unexpected event beyond their control, such as illness. This is not a trade-off for a better benefit but an unwanted loss, and adding a penalty to that loss would be inhumane.</p><p>The handling is therefore quite different. The student notifies the instructor promptly with valid evidence, such as a medical certificate. The absence is excused from the attendance mark; a missed test is retaken or replaced, because this restores a fair opportunity rather than granting a favour. Responsibility for learning still lies with the student: the instructor provides materials such as slides, videos and readings; the student studies independently, borrows notes or joins a study group; and the instructor answers specific questions after the student has studied, rather than re-teaching the whole class.</p><h3>10.3. Why this is fair</h3><p>Distinguishing the two kinds of absence protects all three parties. Students facing emergencies are not penalized for what they cannot control. Students who attend keep the irreplaceable benefit of live instruction and interaction. Instructors have a clear procedure instead of deciding case by case.</p><h2>Conclusion</h2><p>Opportunity cost is the value of the best alternative forgone, and it is present in every decision because resources are always limited. Using your own assets and time does not make their cost zero: economic profit, revenue minus explicit and implicit costs, is the right measure of whether a project is worth doing. For capital, opportunity cost underlies the MARR and the discount rate, provided you compare with an alternative of comparable risk.</p><p>A sunk cost is a cost already incurred that cannot be recovered; it should not influence future decisions. Only relevant costs, the future cash flows that differ between options, belong in the analysis, and salvage values, cancellation penalties and tax effects, which look as if they belong to the past, are in fact future cash flows. The sunk cost trap persists because of very human mechanisms (loss aversion, the wish to be consistent, ego), which in organizations become escalation of commitment. The most effective way out is not willpower but process: reframe the question from today, think in opportunity costs, ask an outsider, separate the person from the decision, and set stopping points before you begin.</p><p>Taken together, the two ideas give one habit worth keeping: ask what the best thing you are giving up is, and refuse to let what you cannot get back decide what you do next.</p><h2>References</h2><p>Arkes, H. R., &amp; Ayton, P. (1999). The sunk cost and Concorde effects: Are humans less rational than lower animals? <em>Psychological Bulletin, 125</em>(5), 591&#8211;600. <a href="https://doi.org/10.1037/0033-2909.125.5.591">https://doi.org/10.1037/0033-2909.125.5.591</a></p><p>Arkes, H. R., &amp; Blumer, C. (1985). The psychology of sunk cost. <em>Organizational Behavior and Human Decision Processes, 35</em>(1), 124&#8211;140. <a href="https://doi.org/10.1016/0749-5978(85">https://doi.org/10.1016/0749-5978(85)90049-4</a>90049-4)</p><p>Buchanan, J. M. (2008). Opportunity cost. In S. N. Durlauf &amp; L. E. Blume (Eds.), <em>The new Palgrave dictionary of economics</em> (2nd ed.). Palgrave Macmillan.</p><p>Frederick, S., Novemsky, N., Wang, J., Dhar, R., &amp; Nowlis, S. (2009). Opportunity cost neglect. <em>Journal of Consumer Research, 36</em>(4), 553&#8211;561. <a href="https://doi.org/10.1086/599764">https://doi.org/10.1086/599764</a></p><p>Kahneman, D., &amp; Tversky, A. (1979). Prospect theory: An analysis of decision under risk. <em>Econometrica, 47</em>(2), 263&#8211;291. <a href="https://doi.org/10.2307/1914185">https://doi.org/10.2307/1914185</a></p><p>Mankiw, N. G. (2021). <em>Principles of economics</em> (9th ed.). Cengage.</p><p>Park, C. S. (2019). <em>Contemporary engineering economics</em> (6th ed.). Pearson.</p><p>Shefrin, H., &amp; Statman, M. (1985). The disposition to sell winners too early and ride losers too long: Theory and evidence. <em>Journal of Finance, 40</em>(3), 777&#8211;790. <a href="https://doi.org/10.1111/j.1540-6261.1985.tb05002.x">https://doi.org/10.1111/j.1540-6261.1985.tb05002.x</a></p><p>Staw, B. M. (1976). Knee-deep in the big muddy: A study of escalating commitment to a chosen course of action. <em>Organizational Behavior and Human Performance, 16</em>(1), 27&#8211;44. <a href="https://doi.org/10.1016/0030-5073(76">https://doi.org/10.1016/0030-5073(76)90005-2</a>90005-2)</p>]]></content:encoded></item></channel></rss>